Jan
22
2018

Work at the Meelick-Lock is progressing.

Victoria Lock Meelick; © esri; click picture to "Arcgis Map"

Victoria Lock Meelick; © esri

Niall Galway has taken excellent photos last weekend during a visit to the construction site at the Meelick-/Victoria lock. I think this documentation of the exchange of the lower lock gates shows once in a while how much effort is required for the maintenance of the „Inland Waterways Ireland“ to make it possible for us to sail from Killaloe to Beleek.
But let the photos speak for themselves. To get to the photo album, please click on the picture.
Have fun watching them.
Many thanks to Niall, who provided me with the photos.

Die Arbeiten an der Meelick-Schleuse (Victoria-Lock) schreiten voran

Niall Galway hat letztes Wochenende bei einem Besuch an der Baustelle der Meelick-/Victoria-Schleuse exzellente Fotos gemacht. Ich finde diese Dokumentation des Austausches der unteren Schleusentore und der weiteren Reparaturarbeiten einmalig und sie zeigt, wieviel Aufwand bei der Instandhaltung der „Inland Waterways Ireland“ erforderlich ist, um es uns möglich zu machen, von Killaloe nach Beleek zu schippern. Doch lassen wir die Fotos sprechen. Um zum Fotoalbum zu gelangen, bitte das Bild anklicken.
Viel Spaß beim Anschauen.
Herzlichen Dank an Niall, der mir die Fotos zur Verfügung gestellt hat.

Exchange of the lock gates Meelick Lock; click picture to te Photoalbum from Naill Galway

Lock gates at Meelick Lock © Niall Galway

Exchange of the lock gates Meelick Lock; click picture to te Photoalbum from Naill Galway

View from Lock-Ground © Niall Galway

Meelick Lock; © Map by Captain’s Handbook

Victoria-Lock; © Captain’s Handbook; click picture to "enlarge"

Meelick-Lock; © Captain’s Handbook;

Keine Kommentare »

RSS feed for comments on this post.

Leave a comment

Du musst angemeldet sein, um einen Kommentar abzugeben.

Theme:Aerosold from TheBuckmaker edit by Captain's Handbook © Captain's Handbook ©