MARINE NOTICE, No.53 of 2020

Gesamt Shannon-Map; © esri
Shannon-Navigations-Map; © esri

MARINE NOTICE, No.53 of 2020

Shannon Navigation

Roadmap for reopening of navigation from 29 June 2020

Waterways Ireland wishes to advise all Masters of vessels and water users of the Shannon Navigation that the following reopening of facilities will occur on 29th June 2020.

Navigational Use

      • Locks on the Shannon Navigation will be open from 9am to 6pm daily.

        Winter mooring period will end.

      • The 5 day mooring rule will be in force.
      • Waterways Ireland service blocks will NOT reopen.

General Guidelines

      • Electricity and water services have been reconnected;
      • Normal pump-out facilities are available for boaters. Owners must ensure that travel to pump-out facilities must be undertaken in a responsible manner, minimising the amount of essential movement out on the water;
      • When on jetties please be aware of other users. Wait or move aside to allow others to pass at a safe distance.
      • Observe social distancing protocols – keep a distance of at least 2m (6 feet) away from other people;
      • Be mindful of others and act always with consideration and with respect and observe the leave no trace principles and protect our environment;
      • Observe all health etiquettes when on the towpaths.

In all instances, social distancing must be maintained at all times keeping your distance from both other people and moored boats. Please refer to your relevant representative body for guidance on the most appropriate health and safety precautions and advice.

Any updates to the situation will be communicated via the issuance of Marine Notices, through our Waterways Ireland Social Media channels and website. Should you need our assistance please do contact us by:

email at: https://www.waterwaysireland.org/contact-us
or by phone https://www.waterwaysireland.org/contact-us.

Waterways Ireland thanks all vessel owners and operators for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation, 12 June 2020,087-9852324

Fahrplan für die Wiedereröffnung der Schifffahrt ab 29. Juni 2020
Waterways Ireland möchte alle Schiffskapitäne und Wassernutzer der Shannon Navigation darauf hinweisen, dass die folgende Wiedereröffnung der Einrichtungen am 29. Juni 2020 stattfinden wird.
Navigatorische Nutzung

    • Die Schleusen der Shannon Navigation werden täglich von 9 bis 18 Uhr geöffnet sein
    • Die Liegezeit im Winter endet.
    • Die 5-Tage-Regel für das Anlegen wird in Kraft treten.
    • Die Serviceblöcke von Waterways Ireland werden NICHT wieder geöffnet.

Allgemeine Richtlinien

    • Strom- und Wasserversorgung wurden wieder angeschlossen;
    • Für Bootsfahrer stehen normale Abpumpanlagen zur Verfügung. Die Eigentümer müssen sicherstellen, dass die Anfahrt zu den Abpumpanlagen auf verantwortungsbewusste Weise erfolgt, wobei die wesentlichen Bewegungen auf dem Wasser so gering wie möglich gehalten werden müssen;
    • Wenn Sie sich auf Stegen aufhalten, achten Sie bitte auf andere Benutzer. Warten Sie oder gehen Sie zur Seite, damit andere in sicherem Abstand passieren können.
    • Halten Sie soziale Distanzierungsprotokolle ein – halten Sie einen Abstand von mindestens 2 m (6 Fuß) zu anderen Personen ein;
    • Seien Sie achtsam und handeln Sie immer mit Rücksicht und Respekt und beachten Sie das Prinzip „keine Spuren hinterlassen“ und schützen Sie unsere Umwelt;
    • Beachten Sie auf den Treidelpfaden alle Gesundheits-Etikette.

In allen Fällen muss stets soziale Distanzierung gewahrt werden, indem man sowohl von anderen Menschen als auch von festgemachten Booten Abstand hält. Bitte wenden Sie sich an Ihr zuständiges Vertretungsorgan, um sich über die geeignetsten Gesundheits- und Sicherheitsvorkehrungen und Ratschläge zu informieren.

Alle Aktualisierungen der Situation werden über die Herausgabe von Mitteilungen für die Marine, über unsere sozialen Medienkanäle von Waterways Ireland und über unsere Website bekannt gegeben. Sollten Sie unsere Hilfe benötigen, wenden Sie sich bitte:

email at: https://www.waterwaysireland.org/contact-us
or by phone https://www.waterwaysireland.org/contact-us.

Waterways Ireland dankt allen Schiffseignern und -betreibern für ihre Zusammenarbeit in dieser Angelegenheit.

Marine Notice, No.52 of 2020

Jamestown Canal Shannon; © esri; click picture to Albert-Lock
Albert Lock Jamestown Canal; © esri

Marine Notice, No.52 of 2020

Shannon Navigation

Albert Lock

Power disruption – Saturday 13 June 2020

Waterways Ireland wishes to advise masters and users of the Shannon Navigation that the ESB will be carrying out repairs to the electricity network in the Albert lock area between 0930 – 1600hrs on Sat 13 June 2020.
There will be occasional disruption to lock passage at Albert Lock during this time.
Waterways Ireland thanks its customers for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation, 12 June 2020, Tel: + 353 87 9852324

Albert Lock Jamestown Canal Jetty
Albert Lock Jamestown Canal Jetty
Albert Lock Jamestown Canal In der Schleuse
Albert Lock  In der Schleuse

Albert Lock
Stromunterbrechung – Samstag, 13. Juni 2020
Waterways Ireland möchte die Kapitäne und Nutzer der Shannon-Schifffahrt darauf hinweisen, dass die ESB am 13. Juni 2020 zwischen 9.30 und 16.00 Uhr Reparaturen am Stromnetz im Bereich der Albert-Schleuse durchführen wird.
Während dieser Zeit wird es gelegentlich zu Unterbrechungen der Schleusendurchfahrt an der Albert Lock kommen.
Waterways Ireland dankt seinen Kunden für ihre Zusammenarbeit in dieser Angelegenheit.

MARINE NOTICE, No. 40 of 2020 Updated

Middle Gound Lough Derg; © esri; click to Arcgis Map "Middle Gound on Lough Derg"
Middle Gound Lough Derg; © esri
Middle Gound Lough Derg; © esri

MARINE NOTICE, No. 40 of 2020

Updated – 05 June 2020

SHANNON NAVIGATION

Lough Derg Middle Ground

Red Navigation Marker 1203 – Back in station

Waterways Ireland wishes to advise all Masters of vessels and water users that Red Navigation Marker 1203 marking the northern side of the Middle Ground is back in station.

Waterways Ireland thanks all vessel owners and operators for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation, 05 June 2020, Tel:00 353(0)90 6494232

Lough Derg, Mittelgrund
Rote Navigationsmarkierung 1203 – Zurück auf Station.
Waterways Ireland möchte alle Schiffskapitäne und Wassernutzer darauf hinweisen, dass der Rote Navigationsmarker 1203, der die Nordseite des Middle Ground markiert, wieder in Position ist.
Waterways Ireland dankt allen Schiffseignern und Betreibern für ihre Mitarbeit in dieser Angelegenheit

MARINE NOTICE, No. 51 of 2020

Map Inland Waterways Ireland;© Waterways Ireland
Inland Waterway; © WI

MARINE NOTICE, No. 51 of 2020

Royal Canal, Grand Canal, Barrow Line & Navigation

Reopening of navigations from 8th June 2020

Waterways Ireland wishes to advise masters and users of the Royal Canal, Grand Canal, Barrow Line & Navigation of the following additional details & clarifications in relation to these navigations, further to the recent MN44/2020 & re-opening roadmap.

    •  Lock operating Hours – 08th to 29th June – 09:30hrs to 17:00hrs daily.
    •  Navigation remains open within 5km of your home; from 8th June this is expected to increase to within 20km from your home
    •  As a cautionary note, water levels are generally low due to the recent time of low rainfall. Also normal maintenance weed-cutting of navigation channels has been late in starting due to the ongoing restrictions, so additional weed growth can be expected in the navigation channels. Masters are asked to contact the local waterway patroller for updated information if wishing to navigate a particular area
    •  Due to the above points, arrangements for boat passage in / out from Dublin are not expected to resume until Phase 3 of the roadmap, at which point they will revert to those set out in MN10/2020. Masters are also advised as an advance notice that works are planned to be undertaken at Lock C4 Mespil Road from end August, which subject to confirmation would necessitate further closure again at this point.
    • The Barrow navigation is closed at Athy and Carlow due to the weir breaches as previously advised by Marine Notices. The Barrow line section is open to navigation.

Waterways Ireland thanks its customers for their ongoing understanding during the navigation re-opening process.
For further information on the reopening of the navigation please visit www.waterwaysireland.org

P. Harkin, Inspector of Navigation, Waterways Ireland, 05 June 2020

Royal Canal, Grand Canal, Barrow Line & Navigation
Wiedereröffnung der Schifffahrt ab 8. Juni 2020
Waterways Ireland möchte die Kapitäne und Benutzer des Royal Canal, des Grand Canal, der Barrow Line und der Navigation auf die folgenden zusätzlichen Details und Klarstellungen in Bezug auf diese Schifffahrtswege hinweisen, im Anschluss an die jüngste MN44/2020 und die Roadmap zur Wiedereröffnung.

    • Schleusenöffnungszeiten – 08. bis 29. Juni – täglich von 09:30 Uhr bis 17:00 Uhr.
    • Die Schifffahrt bleibt in einem Umkreis von 5 km von Ihrem Wohnort geöffnet; ab dem 8. Juni wird dies voraussichtlich auf einen Umkreis von 20 km von Ihrem Wohnort ausgedehnt.
    • Vorsichtshalber sei darauf hingewiesen, dass die Wasserstände aufgrund der jüngsten Zeit mit geringen Niederschlägen im Allgemeinen niedrig sind. Auch der normale Unterhaltungs-Unkrautbeschnitt der Schifffahrtskanäle hat aufgrund der anhaltenden Beschränkungen erst spät begonnen, so dass mit zusätzlichem Unkrautwachstum in den Schifffahrtskanälen gerechnet werden kann. Die Kapitäne werden gebeten, sich für aktuelle Informationen mit dem örtlichen Wasserstraßen-Patrouille in Verbindung zu setzen, wenn sie ein bestimmtes Gebiet befahren möchten.
    • Aufgrund der oben genannten Punkte ist nicht zu erwarten, dass die Vorkehrungen für die Schiffspassage von und nach Dublin vor Phase 3 des Fahrplans wieder aufgenommen werden und dann wieder zu den in MN10/2020 festgelegten Regelungen zurückkehren. Die Kapitäne werden außerdem als Vorankündigung darauf hingewiesen, dass ab Ende August Arbeiten an der Schleuse C4 Mespil Road geplant sind, die vorbehaltlich einer Bestätigung eine weitere Schließung zu diesem Zeitpunkt erfordern würden.
    • Die Barrow-Schifffahrt ist in Athy und Carlow aufgrund der Wehrbrüche geschlossen, wie zuvor in den Mitteilungen der Marine angekündigt. Der Abschnitt Barrow Line ist für die Schifffahrt geöffnet.

Waterways Ireland dankt seinen Kunden für ihr anhaltendes Verständnis während des Wiedereröffnungsprozesses der Schifffahrt.
Für weitere Informationen über die Wiedereröffnung der Schifffahrt besuchen Sie bitte www.waterwaysireland.org