MARINE NOTICE, No. 31 of 2022

Enniskillen-Round "O"; © esri; click to Arcgis Map "Enniskillen-Round "O"
Enniskillen-Round „O“; © esri

MARINE NOTICE, No. 31 of 2022

Erne System

Enniskillen, Round ‘O’ Slipway

Works to slipway entrance –
12th to 15th April 2022

Waterways Ireland wishes to advise Masters of Vessels and waterways users on the Erne System that remedial works on the entrance to the Round ‘O’ Slipway are planned from 08:00hrs Tuesday 12th April to 07:00hrs Friday 15th April inclusive.

Access to Round ‘O’ Slipway will not be possible during these works.

Waterways Ireland thanks its customers for their co-operation.

P Harkin, Inspector of Navigation, 08 April 2022

Enniskillen Round O
Enniskillen Round O

Erne System; Enniskillen, Round ‚O‘ Slipway
Arbeiten an der Einfahrt zur Slipanlage – 12. bis 15. April 2022
Waterways Ireland möchte Schiffskapitäne und Wasserstraßenbenutzer auf dem Erne System darauf hinweisen, dass von Dienstag, den 12. April um 08:00 Uhr bis einschließlich Freitag, den 15. April um 07:00 Uhr Sanierungsarbeiten an der Einfahrt zur Round ‚O‘ Slipway geplant sind.
Der Zugang zur Round ‚O‘ Slipway wird während dieser Arbeiten nicht möglich sein.
Waterways Ireland dankt seinen Kunden für ihre Kooperation.

MARINE NOTICE, No 30. of 2022

 Athlone Lock © esri; click picture to esri maps " Athlone Lock © esri"
Link to Athlone Lock © esri

MARINE NOTICE, No 30. of 2022

Shannon Navigation Athlone

Construction of pedestrian and cycleway bridge
Commencing on 03 May 2022

Waterways Ireland wishes to advise all masters of vessels and waterways users that the construction of the Athlone pedestrian and cycleway bridge will commence on 03 May 2022. The pedestrian and cycleway bridge will be built approx. 50 metres upstream of Athlone town bridge.
The navigation channel in the vicinity of the in-water works will be restricted to a width of 15 metres from 03 May 2022. Both sides of the navigation channel will be buoyed with temporary makers. Large barges, workboats and other equipment will be operating in the navigation from Wansboro’s field (upstream of the Railway Bridge) to Athlone town bridge.
Masters of vessels are advised to proceed with additional caution in the vicinity of the works and to follow the instructions of safety craft and personnel in the area.
Phase 1 of the project commencing on 03 May 2022 involves the installation of a cofferdam which will take approx. 4 weeks to complete. Details of further phases will be advised in due course.
Waterways Ireland thanks its customers for their cooperation.

Phase 1

Phase 1 Centre Pier Cofferdam
Phase 1 Centre Pier Cofferdam; © WI

Installation of centre pier cofferdam. Approx. duration of 4 weeks commencing from 3rd May – Maintain 15-18m Navigation Channel along West Bank

Phase 2

Phase 2 Temp Supports and Centre Pier in Position; © WI
Phase 2 Temp Supports and Centre Pier in Position; © WI

Temporary supports and centre pier in position from Mid-July – Navigation Channel reduced to approx. 15m

Paddy Harkin, Cdr (Rtd), Inspector of Navigation, Waterways Ireland, The Docks, Athlone, Co Westmeath, 08 April 2022

Athlone Shannon
Bau einer Fußgänger- und Radwegbrücke; Baubeginn am 03. Mai 2022
Waterways Ireland möchte alle Schiffskapitäne und Wasserstraßennutzer darauf hinweisen, dass am 3. Mai 2022 mit dem Bau der Fußgänger- und Radwegbrücke in Athlone begonnen wird. Die Fußgänger- und Radwegbrücke wird ca. 50 Meter stromaufwärts der Athlone Stadtbrücke gebaut.
Die Fahrrinne in der Nähe der Bauarbeiten wird ab dem 03. Mai 2022 auf eine Breite von 15 Metern beschränkt. Beide Seiten der Fahrrinne werden mit provisorischen Bojen versehen. Große Lastkähne, Arbeitsboote und andere Ausrüstungen werden in der Fahrrinne von Wansboro’s Field (stromaufwärts der Eisenbahnbrücke) bis zur Athlone Town Bridge verkehren.
Die Kapitäne von Schiffen werden gebeten, in der Nähe der Arbeiten besonders vorsichtig zu fahren und den Anweisungen der Sicherheits-fahrzeuge und des Personals in diesem Gebiet Folge zu leisten.
Phase 1 des Projekts, die am 03. Mai 2022 beginnt, umfasst die Errichtung eines Fangedamms, die ca. 4 Wochen in Anspruch nehmen wird. Einzelheiten zu den weiteren Phasen werden zu gegebener Zeit bekannt gegeben.
Waterways Ireland dankt seinen Kunden für ihre Mitarbeit.

Phase 1
Einbau des Kofferdamms für die Mittelmole. Dauer ca. 4 Wochen, beginnend am 3. Mai – Aufrechterhaltung der 15-18 m breiten Fahrrinne am Westufer

Phase 2
Temporäre Stützen und Mittelmole in Position ab Mitte Juli – Reduzierung der Fahrrinne auf ca. 15 m

MARINE NOTICE, No. 27 of 2022 Updated

Shannon-Tarmonbarry; © esri;
Link to Shannon-Tarmonbarry Map; © esri

MARINE NOTICE, No. 27 of 2022 Updated

Shannon Navigation

Tarmonbarry Lock

Reopened after emergency repair works

Waterways Ireland wishes to advise all masters of vessels and water users that Tarmonbarry Lock is has reopened after emergency repair works.
Waterways Ireland apologies for any inconvenience caused and wishes to thank its customers for their cooperation.

P Harkin, Inspector of Navigation, 07 April 2022

Tarmonbarry Lock  Shannon
Tarmonbarry Lock Shannon Navigation

Tarmonbarry Lock  Nach Notreparaturen wieder geöffnet!
Waterways Ireland möchte alle Schiffskapitäne und Wasserbenutzer darüber informieren, dass die Tarmonbarry-Schleuse nach dringenden Reparatur-arbeiten wieder geöffnet ist.
Waterways Ireland entschuldigt sich für die entstandenen Unannehm-lichkeiten und bedankt sich bei seinen Kunden für ihre Kooperation.

MARINE NOTICE, No. 29 of 2022

Royal Canal 2nd Lock & 4th Lock; © ArcGis
Royal Canal 2nd Lock & 4th Lock; © ArcGis

MARINE NOTICE, No. 29 of 2022

Royal Canal

2nd Lock & 4th Lock – gate repair and measuring works

Closed to navigation from 12 April for 2 weeks

Waterways Ireland wishes to advise Masters of Vessels on the Royal Canal – 2nd Lock and 4th Lock – that there will be no boat passages permitted from next Tuesday 12th April for 2 weeks due to gate repair, gate measurement and associated works. Sections of towpath on the south side of the canal also require closure during this time.
Waterways Ireland thanks Master of Vessels for their co-operation.

P Harkin, Inspector of Navigation, 07 April 2022

Link to Royal-Canal-Lock-2_ © marinas.com
Link to Royal-Canal-Lock-2_ © marinas.com
Link to Royal-Canal-Lock-4_ © marinas.com
Link to Royal-Canal-Lock-4_ © marinas.com

Royal Canal 2. und 4. Schleuse – Torreparatur und Messarbeiten
Ab dem 12. April für 2 Wochen für die Schifffahrt geschlossen
Waterways Ireland möchte die Kapitäne von Schiffen auf dem Royal Canal – 2nd Lock und 4th Lock – darauf hinweisen, dass ab kommenden Dienstag, dem 12. April, zwei Wochen lang keine Bootsdurchfahrten möglich sind, da Reparaturen an den Toren, Messungen an den Toren und damit verbundene Arbeiten durchgeführt werden. Auch Abschnitte des Treidelpfades auf der Südseite des Kanals müssen in dieser Zeit gesperrt werden.
Waterways Ireland bedankt sich bei Master of Vessels für ihre Kooperation.

MARINE NOTICE, No. 28 of 2022

Gesamt Shannon-Map; © esri
Gesamt Shannon-Map; © esri

Shannon Erne Waterway; © esri click to SEW-Map esri"
Shannon Erne Waterway; © esri

MARINE NOTICE, No. 28 of 2022

Shannon Navigation & Shannon Erne Waterway

Public Harbours

End of Winter Mooring Period

Waterways Ireland wishes to advise Masters of vessels that the winter mooring period ended on 31 Mar 2022.

Shannon Navigation Bye-law No. 17(3) now applies i.e. vessels should not berth in the same harbour for longer than the statutory period of 5 consecutive days nor more than a total of 7 days in any one month.

Waterways Ireland thanks its customers for their co-operation.

P Harkin, Cdr (Rtd), Inspector of Navigation, 05 April 2022

Shannon Navigation & Shannon Erne Waterway
Öffentliche Häfen, Ende der Winterliegezeit
Waterways Ireland möchte die Kapitäne von Schiffen darauf hinweisen, dass die Winterliegezeit am 31. März 2022 endet.
Es gilt nun die Shannon Navigation Bye-law Nr. 17(3), d.h. Schiffe dürfen nicht länger als die gesetzlich vorgeschriebene Zeit von 5 aufeinanderfolgenden Tagen und nicht länger als insgesamt 7 Tage in einem Monat im selben Hafen anlegen.
Waterways Ireland dankt seinen Kunden für ihre Mitarbeit.