MARINE NOTICE, No. 21 of 2021

Waterways-Ireland
Waterways-Ireland
Covid-19 Link to RKI Germany
Covid-19 Link to RKI Germany

MARINE NOTICE, No. 21 of 2021

The Erne System, the Lower Bann Navigation and the Shannon Erne Waterway (within Northern Ireland)

COVID-19 Response   Access to navigations and availability of Services

Waterways Ireland wishes to advise all Masters of vessels and water users on The Erne System, the Shannon Erne Waterway (within Northern Ireland) and the Lower Bann Navigation of the following notice in relation to access to the navigations and availability of services. These restrictions are in line with guidance provided by the Northern Ireland Executive.

Shannon Erne Waterway – with effect from Monday 10th May 2021

      • All Waterways Ireland locks and service blocks will be open.
      • Local area access to jetties and moorings in accordance with Northern Ireland Executive guidance.
      • Pump-out facilities are available for use.

Erne System – with effect from Monday 10th May 2021

      • • The facilities on the Erne System will be open.
      • • Local area access to jetties and moorings in accordance with Northern Ireland Executive guidance.
      • • Pump-out facilities are available for use.

Lower Bann navigation – various dates as outlined below

      • All Waterways Ireland service blocks will be open from Wednesday 12th May 2021.
      • Local area access to jetties and moorings in accordance with Northern Ireland Executive guidance.
      • Portna and Movanagher Locks – In operation from Wednesday 12th May 2021.
      • Cutts Lock – Out of Operation until Wednesday 12th May 2021 to enable preparation work on lock gates.
      • Toome Lock – Out of operation until Friday 28th May 2021 to enable work on lock gates and lock.
      • Carnroe Lock – Out of operation until further notice pending ongoing engineering investigations.
      • When on jetties please be aware of other users. Wait or move aside to allow others to pass at a safe distance.

General Guidance
We will continually review such measures in light of direction and advice from Government and health professionals and any decisions on service provision will be communicated via the issuance of Marine Notices. If we all continue to observe government guidance, follow advice to limit use, and strictly observe social distancing, together we can combat this pandemic – and be able to enjoy getting back out on or by our waterways when we’ve beaten it.
While our staff are working from home, they are available by phone during normal working hours. Should you need our assistance please do contact us by email at info@waterwaysireland.org
or by phone https://www.waterwaysireland.org/contact-us
Waterways Ireland thanks all vessel owners and operators for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation, Waterways Ireland, 07 May 2021

COVID-19 Antwort – Zugangsmöglichkeiten zu den Navigationssystemen und Verfügbarkeit von Services
Waterways Ireland möchte alle Kapitäne von Schiffen und Wasserbenutzer auf dem Erne System, dem Shannon Erne Waterway (innerhalb Nordirlands) und der Lower Bann Navigation auf die folgende Mitteilung in Bezug auf den Zugang zu den Navigationen und die Verfügbarkeit von Dienstleistungen hinweisen. Diese Einschränkungen stehen im Einklang mit den Richtlinien der nordirischen Regierung.

Shannon Erne Waterway – mit Wirkung ab Montag, 10. Mai 2021

      • Alle Schleusen und Serviceblöcke von Waterways Ireland werden geöffnet sein.
      • Der Zugang zu den Anlegestellen und Liegeplätzen in der Umgebung entspricht den Richtlinien der Northern Ireland Executive.
      • Pump-Out-Einrichtungen können genutzt werden.

Erne System – mit Wirkung ab Montag, 10. Mai 2021

  • Die Einrichtungen auf dem Erne System werden geöffnet sein.
  • Lokaler Zugang zu Stegen und Liegeplätzen in Übereinstimmung mit den Richtlinien der nordirischen Regierung.
  • Pump-out-Einrichtungen stehen zur Nutzung zur Verfügung.
  • Lower Bann Navigation – verschiedene Termine wie unten angegeben
  • Alle Serviceblöcke von Waterways Ireland sind ab Mittwoch, dem 12. Mai 2021, geöffnet.
  • Lokaler Zugang zu Stegen und Liegeplätzen in Übereinstimmung mit den Richtlinien der nordirischen Regierung.
  • Portna und Movanagher Locks – In Betrieb ab Mittwoch, 12. Mai 2021.
  • Cutts Lock – Außer Betrieb bis Mittwoch, 12. Mai 2021, um Vorbereitungs-arbeiten an den Schleusentoren zu ermöglichen.
  • Toome Lock – Außer Betrieb bis Freitag, 28. Mai 2021, um Arbeiten an Schleusentoren und Schleuse zu ermöglichen.
  • Carnroe Lock – Bis auf Weiteres außer Betrieb, da technische Untersuchungen durchgeführt werden.
  • Wenn Sie sich auf den Stegen aufhalten, nehmen Sie bitte Rücksicht auf andere Benutzer. Warten Sie oder gehen Sie zur Seite, um anderen das Passieren in einem sicheren Abstand zu ermöglichen.

Allgemeine Hinweise
Wir werden diese Maßnahmen unter Berücksichtigung der Richtlinien und Ratschläge der Regierung und der Gesundheitsexperten ständig überprüfen und alle Entscheidungen über die Bereitstellung von Diensten werden durch die Ausgabe von Marine-Mitteilungen bekannt gegeben. Wenn wir uns alle weiterhin an die Richtlinien der Regierung halten, die Ratschläge zur Einschränkung des Konsums befolgen und den sozialen Abstand strikt einhalten, können wir gemeinsam diese Pandemie bekämpfen – und es genießen, wieder auf oder an unseren Wasserstraßen unterwegs zu sein, wenn wir sie besiegt haben.
Während unsere Mitarbeiter von zu Hause aus arbeiten, sind sie während der normalen Arbeitszeiten telefonisch erreichbar. Sollten Sie unsere Hilfe benötigen, kontaktieren Sie uns bitte
per E-Mail an   info@waterwaysireland.org
oder per Telefon   https://www.waterwaysireland.org/contact-us

MARINE NOTICE, No. 18 of 2021

Inland Waterway; © WI
Inland Waterway; © WI

MARINE NOTICE, No. 18 of 2021

The Erne System, the Shannon Erne Waterway (within Northern Ireland) and the Lower Bann Navigation

COVID-19 Response
Access to navigations and availability of Services
Waterways Ireland wishes to advise all Masters of vessels and water users on The Erne System, the Shannon Erne Waterway (within Northern Ireland) and the Lower Bann Navigation of the following notice in relation to access to the navigations and availability of services. These restrictions are in line with the Phase 2 measures announced by the Northern Ireland Executive.

    • All Waterways Ireland locks and service blocks remain closed.
    • Local area access to jetties and moorings in accordance with Northern Ireland Executive guidance.
    • Pump-out facilities are available for use. Owners must ensure that travel to pump-out facilities must be undertaken in a responsible manner minimising the amount of essential movement out on the water.
    • When on jetties please be aware of other users. Wait or move aside to allow others to pass at a safe distance.

We will continually review such measures in light of direction and advice from Government and health professionals and any decisions on service provision will be communicated via the issuance of Marine Notices. If we all continue to observe government guidance, follow advice to limit use, and strictly observe social distancing, together we can combat this pandemic – and be able to enjoy getting back out on or by our waterways when we’ve beaten it.

While our staff are working from home, they are available by phone during normal working hours. Should you need our assistance please do contact us by email at info@waterwaysireland.org
or by phone https://www.waterwaysireland.org/contact-us.

Waterways Ireland thanks all vessel owners and operators for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation, Waterways Ireland, 09 April 2021

COVID-19 Antwort
Zugang zu den Schifffahrtswegen und Verfügbarkeit von Dienstleistungen

Waterways Ireland möchte alle Kapitäne von Schiffen und Wasserbenutzer auf dem Erne System, dem Shannon Erne Waterway (innerhalb Nordirlands) und der Lower Bann Navigation auf die folgende Mitteilung bezüglich des Zugangs zu den Schifffahrtswegen und der Verfügbarkeit von Dienstleistungen hinweisen. Diese Einschränkungen stehen im Einklang mit den Maßnahmen der Phase 2, die von der nordirischen Regierung angekündigt wurden.

    • Alle Schleusen und Serviceblöcke von Waterways Ireland bleiben geschlossen.
    • Der Zugang zu den Stegen und Liegeplätzen in der Umgebung ist gemäß den Richtlinien der nordirischen Regierung möglich.
    • Auspumpeinrichtungen können genutzt werden. Die Eigner müssen sicherstellen, dass die Fahrt zu den Auspumpanlagen auf eine verantwortungsvolle Art und Weise durchgeführt wird, die die notwendige Bewegung auf dem Wasser minimiert.
    • Wenn Sie sich auf den Stegen aufhalten, nehmen Sie bitte Rücksicht auf andere Benutzer. Warten Sie oder gehen Sie zur Seite, um anderen das Passieren in einem sicheren Abstand zu ermöglichen.

Wir werden diese Maßnahmen im Lichte der Anweisungen und Ratschläge der Regierung und von Gesundheitsexperten ständig überprüfen, und alle Entscheidungen über die Bereitstellung von Diensten werden durch die Ausgabe von Marine-Mitteilungen bekannt gegeben. Wenn wir uns alle weiterhin an die Richtlinien der Regierung halten, die Ratschläge zur Einschränkung des Konsums befolgen und den sozialen Abstand strikt einhalten, können wir gemeinsam diese Pandemie bekämpfen – und es genießen, wieder auf oder an unseren Wasserstraßen unterwegs zu sein, wenn wir sie besiegt haben.

Während unsere Mitarbeiter von zu Hause aus arbeiten, sind sie während der normalen Arbeitszeiten telefonisch erreichbar. Sollten Sie unsere Hilfe benötigen, kontaktieren Sie uns bitte per E-Mail an info@waterwaysireland.org oder per Telefon https://www.waterwaysireland.org/contact-us.

Waterways Ireland dankt allen Schiffseignern und -betreibern für ihre Kooperation in dieser Angelegenheit.

MARINE NOTICE, No. 96 of 2020

Inland Waterway; © WI
Inland Waterway; © WI

MARINE NOTICE, No. 96 of 2020

The Erne System, the Shannon Erne Waterway (within Northern Ireland) and the Lower Bann Navigation

COVID-19 Response

Availability of Services  With effect from 22 Oct 2020

Waterways Ireland wishes to advise all Masters of vessels and water users on The Erne System, the Shannon Erne Waterway (within Northern Ireland) and the Lower Bann Navigation of the following notice in relation to the services available on the navigations. These restrictions are in line with the measures announced by the Northern Ireland Executive.

    • All Waterways Ireland locks and service blocks will be closed from 22 Oct 2020.
    • Pump-out facilities are available for use. Owners must ensure that travel to pump-out facilities must be undertaken in a responsible manner minimising the amount of essential movement out on the water.
    • When on jetties please be aware of other users. Wait or move aside to allow others to pass at a safe distance.
    • Social distancing continues to be maintained with only members of your household permitted to go onboard your boat until further notice.
    • Owners are reminded that the Northern Ireland Executive has advised that no unnecessary travel should be undertaken at this time.

We will continually review such measures in light of direction and advice from Government and health professionals and any decisions on service provision will be communicated via the issuance of Marine Notices. If we all continue to observe government guidance, follow advice to limit use, and strictly observe social distancing, together we can combat this pandemic – and be able to enjoy getting back out on or by our waterways when we’ve beaten it.

While our staff are working from home, they are available by phone during normal working hours. Should you need our assistance please do contact us:

by email at info@waterwaysireland.org or by phone https://www.waterwaysireland.org/contact-us.

Waterways Ireland thanks all vessel owners and operators for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation, Waterways Ireland, 21 Oct 2020

Lower Lough Erne; © esri; click to ArcGiMap Erne
Lower Erne; © esri

Locks Lower Bann North Ireland; "click pictur to ArcGis Map Lower Bann Northern Ireland"
Locks Bridges Lower Bann NI ©esri

Das Erne-System, der Shannon Erne Waterway (innerhalb Nordirlands) und die Lower Bann Navigation
COVID-19 Antwort
Verfügbarkeit von Dienstleistungen Mit Wirkung vom 22. Oktober 2020
Waterways Ireland möchte alle Schiffskapitäne und Wassernutzer des Erne-Systems, des Shannon Erne Waterway (innerhalb Nordirlands) und der Lower Bann Navigation auf die folgende Mitteilung in Bezug auf die auf den Schifffahrtswegen verfügbaren Dienste hinweisen. Diese Einschränkungen stehen im Einklang mit den von der nordirischen Exekutive angekündigten Maßnahmen.

    • Alle Schleusen und Betriebssperren von Waterways Ireland werden ab dem 22. Oktober 2020 geschlossen.
    • Abpumpvorrichtungen stehen zur Nutzung zur Verfügung. Die Eigentümer müssen sicherstellen, dass die Anfahrt zu den Abpumpanlagen auf verantwortungsbewusste Weise erfolgt, um den Umfang der notwendigen Bewegungen auf dem Wasser so gering wie möglich zu halten.
    • Wenn Sie sich auf Stegen aufhalten, achten Sie bitte auf andere Benutzer. Warten Sie oder gehen Sie zur Seite, damit andere in sicherem Abstand passieren können.
    • Der soziale Abstand wird aufrechterhalten, wobei bis auf weiteres nur Mitglieder Ihres Haushalts an Bord Ihres Bootes gehen dürfen.
    • Die Eigentümer werden daran erinnert, dass die nordirische Exekutive darauf hingewiesen hat, dass zu diesem Zeitpunkt keine unnötigen Reisen unternommen werden sollten.

Wir werden solche Maßnahmen unter Berücksichtigung der Anweisungen und Ratschläge von Regierungs- und Gesundheitsexperten ständig überprüfen, und alle Entscheidungen über die Erbringung von Dienstleistungen werden durch die Herausgabe von Mitteilungen der Marine bekannt gegeben. Wenn wir uns alle weiterhin an die Anweisungen der Regierung halten, den Ratschlag befolgen, die Nutzung einzuschränken, und uns strikt an die soziale Distanzierung halten, können wir diese Pandemie gemeinsam bekämpfen – und es genießen, wieder auf oder über unsere Wasserstraßen zu fahren, wenn wir sie besiegt haben.
Während unsere Mitarbeiter von zu Hause aus arbeiten, sind sie während der normalen Arbeitszeiten telefonisch erreichbar. Sollten Sie unsere Hilfe benötigen, wenden Sie sich bitte per E-Mail an info@waterwaysireland.org oder telefonisch an https://www.waterwaysireland.org/contact-us.
Waterways Ireland dankt allen Schiffseignern und -betreibern für ihre Zusammenarbeit in dieser Angelegenheit.