MARINE NOTICE 021 of 2013

Portora Lock, Lower Lough Erne; click to "enlarge"

Portora Lock

Essential Maintenance

Waterways Ireland wishes to advise masters of vessels that The Rivers Agency are undertaking essential bank maintenance immediately upstream of  Portora lock. There is expected to be some disruption to traffic over the period of maintenance. Masters are requested to follow instructions given by the onsite safety boat.

Waterways Ireland regrets any inconvenience that this may cause its customers.

C.J.Lawn, Lt Cdr (RTD), Inspector of Navigation, 29th February 2013

MARINE NOTICE 020 of 2013

Corraquill Lock 1

Shannon-Erne Waterway

Lock 1  Corraquill Closure

Marine Notice No: 4 of 2013 refers

Waterways Ireland wishes to advise masters and owners of vessels that repairs have been completed to Lock & Gates at Lock 1 Corraquill, Shannon-Erne Waterway

C.J.Lawn, Lt Cdr (RTD), Inspector of Navigation, 25th March 2013

MARINE NOTICE 019 of 2013

 Grand Canal

Dublin Main Line

Portobello to Inchicore

Marine Notices No 120/2012 refers:
Waterways Ireland wishes to advise masters and owners of vessels that dredging has been completed on the Grand Canal, Dublin Main Line, Portobello to Inchicore.

C.J.Lawn, Lt Cdr (RTD), Inspector of Navigation, 19 Mar 2013

MARINE NOTICE 018 of 2013

Grand Canal at Lock 28 Tullamore; © esri; click to Arcgis Map "Grand Canal at Lock 25, 26, and 28 Tullamore"
Grand Canal at Lock 28 Tullamore; © esri

GRAND CANAL

TULLAMORE

Marine Notice No. 136 of 2012 and

Marine Notice No. 10 of 2013 refer.

Waterways Ireland wishes to advise masters and owners of vessels that the closure of the Grand Canal from the Kilbeggan Bridge to Coxes Bridge has been extended from 15th March until 27th March 2013 in order to facilitate completion of works.

Waterways Ireland thanks its customers for their cooperation in this matter.

Charles Lawn, Lt Cdr(rtd), Inspector of Navigation, 15 Mar 2013

MARINE NOTICE 017 of 2013

Tarmonbarry Weir and Lock
Tarmonbarry Weir and Lock;© CHB

SHANNON NAVIGATION

Tarmonbarry

Lock Gate Maintenance

Masters and owners are advised that the Lock Gate maintenance at Tarmombarry have now been completed.
Marine Notice No: 01 of 2013 is hereby withdrawn

C.J.Lawn, Lt Cdr (RTD), Inspector of Navigation, 13 Mar 2013