MARINE NOTICE, No. 29 of 2022
Royal Canal
2nd Lock & 4th Lock – gate repair and measuring works
Closed to navigation from 12 April for 2 weeks
Waterways Ireland wishes to advise Masters of Vessels on the Royal Canal – 2nd Lock and 4th Lock – that there will be no boat passages permitted from next Tuesday 12th April for 2 weeks due to gate repair, gate measurement and associated works. Sections of towpath on the south side of the canal also require closure during this time.
Waterways Ireland thanks Master of Vessels for their co-operation.
P Harkin, Inspector of Navigation, 07 April 2022