MARINE NOTICE, No. 96 of 2023, UPDATED

Shannon Harbour © esri
Shannon Harbour © esri

MARINE NOTICE, No. 96 of 2023, UPDATED

Grand Canal – Shannon Harbour

Quay Wall Repair,
25th September to mid-November

Temporary Navigation markers

Waterways Ireland wishes to advise all masters of vessels and waterway users that it will be carrying out maintenance works on a damaged section of the north quay wall in Shannon Harbour.
Works will begin on Monday the 25th of September and will last approx. 7 weeks, hours of work 9am to 5pm. A section of the harbour wall will be closed off to boat users during this time.
The access road to the north of Shannon harbour will be closed to public traffic and only local traffic will be permitted.
Water Levels in Shannon Harbour may have to be lowered for a time to allow these works to be completed.
Four temporary red navigation markers are in place on the south side of the works location to aid navigation through the area.
Waterways Ireland thanks its customers for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation, Waterways Ireland, 18 October 2023

Shannon Harbour Grand Canal; Captain's Handbook ©
Shannon Harbour Grand Canal; © CHB

Grand Canal – Shannon Harbour; Reparatur der Kaimauer
25. September bis Mitte November, Temporäre Navigationsmarkierungen
Waterways Ireland möchte alle Kapitäne von Schiffen und Wasserstraßenbenutzer darauf hinweisen, dass an einem beschädigten Abschnitt der nördlichen Kaimauer im Shannon Harbour Wartungsarbeiten durchgeführt werden.
Die Arbeiten beginnen am Montag, dem 25. September, und werden ca. 7 Wochen dauern, Arbeitszeiten von 9 bis 17 Uhr. Während dieser Zeit wird ein Teil der Hafenmauer für Bootsfahrer gesperrt sein.
Die Zufahrtsstraße nördlich des Shannon Harbour wird für den öffentlichen Verkehr gesperrt und nur der örtliche Verkehr wird zugelassen.
Der Wasserstand im Shannon Harbour muss unter Umständen vorübergehend gesenkt werden, damit die Arbeiten abgeschlossen werden können.
Auf der Südseite der Baustelle sind vier vorübergehende rote Schifffahrtszeichen aufgestellt, um die Navigation durch das Gebiet zu erleichtern.
Waterways Ireland dankt seinen Gästen für ihre Kooperation in dieser Angelegenheit.

MARINE NOTICE, No. 115 of 2023

LLE-Portora Lock; © esri click to Portora-Lock-Map esri"
LLE-Portora Lock; © esri

MARINE NOTICE, No. 115 of 2023

Erne System

Enniskillen

Operation of Portora Lock

Waterways Ireland wishes to advise Masters of Vessels and waterway users on the Erne System that Portora Lock is in operation. During the locks operating times, a lockkeeper will be present and will complete the operation of the lock gates.
Portora Lock operating times are as follows:

      • 8.00am to 10.30pm 7 days a week when in operation.

Waterways Ireland thanks its customers for their cooperation.

P Harkin, Inspector Of Navigation, Waterways Ireland, 18 October 2023

Portoralock closed
Portoralock closed; ©Pas Vite

Erne System, Enniskillen, Betrieb des Portora Lock
Waterways Ireland möchte die Kapitäne von Schiffen und Wasserstraßenbenutzer des Erne-Systems darauf hinweisen, dass das Portora Lock in Betrieb ist. Während der Betriebszeiten des Portora Lock ist ein Lockkeeper anwesend, der die Bedienung der Schleusentore übernimmt.
Die Betriebszeiten des Portora Lock sind wie folgt:

      • 8.00 Uhr bis 22.30 Uhr an 7 Tagen in der Woche, wenn sie in Betrieb ist.

Waterways Ireland dankt seinen Gästen für ihre Mitarbeit.

MARINE NOTICE, No. 101 of 2023, UPDATED

Mullingar Harbour © esri
The Downs near Mullingar Harbour © esri

MARINE NOTICE, No. 101 of 2023, UPDATED

Royal Canal,

The Downs

Temporary closure of lifting bridge, Until Further Notice

Waterways Ireland wishes to inform masters of vessels and waterway users on the Royal Canal that The Downs Lifting Bridge will be closed for canal traffic effective immediately.
This closure is to facilitate emergency repairs due to vandalism.
Further updates will be issued as required.
Waterways Ireland wishes to apologise for any inconvenience that this temporary closure may cause its customers.

P Harkin, Cdr NS (Rtd), Inspector of Navigation, 13 October 2023.

The Downs Lifting Bridge © Copyright JP by CCL
The Downs Lifting Bridge © Copyright JP by CCL

Royal Canal, The Downs, Temporäre Schließung der Hebebrücke, bis auf Widerruf
Waterways Ireland möchte die Kapitäne von Schiffen und Wasserstraßenbenutzer auf dem Royal Canal darüber informieren, dass die Hebebrücke The Downs ab sofort für den Kanalverkehr gesperrt ist. Diese Sperrung dient der Durchführung von Notreparaturen aufgrund von Vandalismus.
Weitere Informationen werden bei Bedarf veröffentlicht.
Waterways Ireland möchte sich für alle Unannehmlichkeiten entschuldigen, die diese vorübergehende Schließung für seine Gäste mit sich bringen könnte.

MARINE NOTICE, No. 114 of 2023

McCartneys Lock, and the 24th Level Barrow Line;© esri
McCartneys Lock 24th to Moores, Lock 25; © esri

MARINE NOTICE, No. 114 of 2023

Grand Canal- Barrow Line

NOTICE OF CANAL CLOSURE

25th Level – Quay Wall Refurbishment

Waterways Ireland wishes to advise Masters and owners of vessels that the Barrow Line will be closed to vessel traffic from McCartneys, Lock 24 to Moores, Lock 25 to enable essential quay wall refurbishment at Bell Harbour.
This closure will commence on WEDNESDAY 1st NOVEMBER 2023 for a period of approximately 18 WEEKS.
Mooring in Bell Harbour and through navigation will not be possible in this area for the duration of the works. Vessels moored in Bell Harbour will be accommodated on the 24th & 26th Levels during this period.
Vessels in Bell Harbour are requested to vacate the harbour & 25th Level by Tuesday 31st October 2023. Any craft remaining in this area on the 1st November will be removed to alternative mooring on the 26th Level by Waterways Ireland.
Waterways Ireland thanks its customers for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation,12 October 2023

Mc Cartneys Lock 24; Barrow-Line
Moores Lock, 25 Barrow-Line

Grand Canal – Barrow Line,
Ankündigung der Kanalsperrung, 25. Ebene – Kaimauersanierung
Waterways Ireland möchte die Kapitäne und Schiffseigner darauf hinweisen, dass die Barrow Line von McCartneys, Schleuse 24 bis Moores, Schleuse 25 für den Schiffsverkehr gesperrt wird, um die notwendige Sanierung der Kaimauer in Bell Harbour zu ermöglichen.
Diese Schließung beginnt am MITTWOCH, 1. NOVEMBER 2023 für einen Zeitraum von etwa 18 WOCHEN.
Das Anlegen in Bell Harbour und die Durchfahrt sind in diesem Bereich während der Dauer der Arbeiten nicht möglich. Schiffe, die im Bell Harbour festgemacht haben, werden während dieser Zeit auf den Ebenen 24 und 26 untergebracht.
Schiffe im Bell Harbour werden gebeten, den Hafen und die 25. Ebene bis Dienstag, den 31. Oktober 2023, zu verlassen. Alle Schiffe, die sich am 1. November noch in diesem Gebiet befinden, werden von Waterways Ireland zu einem alternativen Liegeplatz auf der 26er Ebene gebracht.

MARINE NOTICE, No 113 of 2023

Lough Erne; © esri; click to "esri map"
Round O (Outside Moorings), Castle Museum, Henry Street and Sligo Road; © esri

 

MARINE NOTICE, No 113 of 2023

Erne System

Lower and Upper Lough Erne

Erne Pike Classic

Friday 13th to Sunday 15th October 2023

Waterways Ireland wishes to advise Masters of Vessels and waterways users on the Erne System that the Erne Pike Classic will take place from Friday 13th to Sunday 15th October 2023.

Erne Pike Classic Friday 13th to Sunday 15th October 2023

Friday 13th Oct involves a shore based angling competition. The Waterways Ireland jetties at Round O (Outside Moorings), Castle Museum, Henry Street and Sligo Road will be closed on Friday 13th October 2023 only to facilitate the shore-based element of the competition.
Saturday 14th and Sunday 15th October involves approx. 100 boats operating between Devenish Island and Carrybridge for the water-based element of the angling competition. During this time, Waterways Ireland advise all masters of vessels to proceed with additional caution in these areas and also to reduce their wash when encountering fishing vessels.
Waterways Ireland thanks its customers for their understanding in relation to this matter.

P Harkin, Inspector of Navigation, 09 October 2023

Henry St. jetties; ©  CHB
Henry St. jetties; © CHB
Castle Jetty Enniskillen; Driftwood.TV
Castle Jetty Enniskillen; © Driftwood.TV

Erne System, Lower und Upper Lough Erne
Erne Pike Classic, Freitag, 13. bis Sonntag, 15. Oktober 2023
Waterways Ireland möchte Schiffskapitäne und Wasserstraßenbenutzer auf dem Erne System darauf hinweisen, dass der Erne Pike Classic von Freitag, den 13. bis Sonntag, den 15. Oktober 2023 stattfinden wird.
Am Freitag, den 13. Oktober findet ein Angelwettbewerb vom Ufer aus statt. Die Anlegestellen von Waterways Ireland bei Round O (Outside Moorings), Castle Museum, Henry Street und Sligo Road werden am Freitag, den 13. Oktober 2023 geschlossen, um den Wettbewerb an Land zu ermöglichen.
Am Samstag, den 14. und Sonntag, den 15. Oktober verkehren ca. 100 Boote zwischen Devenish Island und Carrybridge, um den Angelwettbewerb auf dem Wasser durchzuführen. Waterways Ireland rät allen Schiffsführern, in dieser Zeit in diesen Gebieten besonders vorsichtig zu fahren und bei Begegnungen mit Fischereifahrzeugen die Fahrgeschwindigkeit zu verringern.
Waterways Ireland dankt seinen Kunden für ihr Verständnis in dieser Angelegenheit.