Marine Notice No. 125 of 2025 Update
Royal Canal
Re-Issued: 18 November 2025
Royal Canal Closure Mullingar for Engineering Works Rescheduled
Waterways Ireland wishes to advise users of the Royal Canal in Mullingar that the south towpath will be closed from Baltrasna Bridge to Pipers Boreen to facilitate the installation of a new pedestrian bridge at Saunders Bridge.
![]() |
These works were previously scheduled but were postponed due to adverse weather conditions. The works are now planned to commence from Friday 21 November to Monday 24 November 2025 inclusive. The closure will apply to:
-
-
- Royal Canal Way towpath users
- Waterway users seeking to transit under Saunders Bridge
-
Subsequent closures may be required as the project progresses, and additional notices will issued as needed.
Waterways Ireland apologises for any inconvenience.
Peter Harty, Inspector of Navigation
Inspectorate.Athlone@waterwaysireland.org
Marine Notice Nr. 125 von 2025 Aktualisierung, Royal Canal, Neuausgabe: 18. November 2025
Schließung des Royal Canal in Mullingar wegen Bauarbeiten verschoben
Waterways Ireland möchte die Nutzer des Royal Canal in Mullingar darauf hinweisen, dass der südliche Treidelpfad von der Baltrasna Bridge bis Pipers Boreen gesperrt wird, um die Installation einer neuen Fußgängerbrücke an der Saunders Bridge zu ermöglichen.
Diese Arbeiten waren bereits zuvor geplant, wurden jedoch aufgrund ungünstiger Wetterbedingungen verschoben. Die Arbeiten sollen nun von Freitag, dem 21. November, bis einschließlich Montag, dem 24. November 2025, stattfinden. Die Sperrung gilt für:
-
-
- Nutzer des Royal Canal Way-Treidelpfads
- Nutzer der Wasserstraße, die unter der Saunders Bridge hindurchfahren möchten
-
Im Laufe des Projekts können weitere Sperrungen erforderlich werden. In diesem Fall werden zusätzliche Bekanntmachungen veröffentlicht.
Waterways Ireland entschuldigt sich für etwaige Unannehmlichkeiten.