MARINE NOTICE, No 47 of 2021

Athlone Marina © esri;; click picture to esri maps "Athlone Marina"
Athlone Marina © esri;; click picture to esri maps

MARINE NOTICE, No 47 of 2021

Shannon Navigation – Athlone

Cautionary Advice

Waterways Ireland wishes to advise masters and owners of vessels that instream work will commence on the New Slipway South of the Athlone Lock from the 4th August 2021 (and on the East Bank Approximately 200 metres South of the Weir). Temporary green navigation aids will be placed on the western extremities of the works area.
Masters of vessels are advised to proceed with additional caution at slow speed and keep to the west bank while navigating in this area.
Waterways Ireland apologies for any inconvenience caused.

P Harkin, Inspector of Navigation, 03 August 2021

Athlone White Railway Bridge; © Captain’s Handbook; click picture to "enlarge"
Athlone White Railway Bridge; © Captain’s Handbook
Athlone Town Bridge;© Captain’s Handbook; click to "enlarge"
Athlone Town Bridge;© Captain’s Handbook; click to „enlarge“

Shannon Navigation – Athlone, Warnhinweis zur Vorsicht
Waterways Ireland möchte Kapitäne und Bootsbesitzer darauf hinweisen, dass ab dem 4. August 2021 an der neuen Slipway südlich der Athlone-Schleuse (und am Ostufer ca. 200 m südlich des Wehrs) Arbeiten im Fluss durchgeführt werden. Vorübergehende grüne Navigationshilfen werden an den westlichen Enden des Arbeitsbereichs aufgestellt.
Die Kapitäne von Schiffen werden gebeten, in diesem Bereich mit erhöhter Vorsicht und langsamer Geschwindigkeit zu fahren und sich am Westufer zu halten.
Waterways Ireland entschuldigt sich für die entstandenen Unannehmlich-keiten.