MARINE NOTICE, No. 69 of 2021

Ballykeenan Lock, River Barrow © esri
Ballykeenan Lock, River Barrow © esri

MARINE NOTICE, No. 69 of 2021

Barrow Navigation

Ballykeenan Lock

Temporary Closure until 28 September 2021

Waterways Ireland wishes to advise masters and owners of vessels that Ballykeenan Lock is closed for essential lock gate works. Closure is effective from Friday 24th September to Tuesday 28th September 2021 inclusive.
Waterways Ireland apologies for any inconvenience caused.

P Harkin, Inspector of Navigation, 25 August 2021

Ballykennan Double Lock
Ballykennan Double Lock
Swing bridge Ballykennan Double Lock
Swing bridge Ballykennan Double Lock
Ballykennan Double Lock, lower Chamber
Ballykennan Double Lock, lower Chamber
Driving into the lower Chamber Double Lock
Driving into the lower Chamber Double Lock
Busy lockkeeper at Ballykennan Double Lock
Busy lockkeeper at Ballykennan Double Lock
In the lower Chamber of Ballykennan Double Lock
In the lower Chamber of Ballykennan Double Lock

Ballykeenan Lock
Vorübergehende Schließung bis 28. September 2021
Waterways Ireland möchte Kapitäne und Bootsbesitzer darauf hinweisen, dass die Ballykeenan Lock wegen notwendiger Schleusenarbeiten geschlossen ist. Die Schließung gilt von Freitag, 24. September, bis einschließlich Dienstag, 28. September 2021.
Waterways Ireland entschuldigt sich für die entstandenen Unannehmlichkeiten.