
Marine Notice, No. 24 of 2025 Grand Canal
Issued: 19 March 2025
Grand Canal & Greenway Closure at L’Estrange Bridge
Waterways Ireland advises masters of vessels and Greenway users that navigation on the Grand Canal and access to L’Estrange Bridge will be closed from 18:00 on Saturday, 22 March, to 08:00 on Sunday, 23 March 2025. During this time, vessels will not be permitted to pass under the bridge, and Greenway users will not have access to the bridge.
![]() |
This closure is necessary to facilitate the installation of an overbridging structure for the transport of an abnormal load destined for Shannonbridge Power Station. For the duration of the installation, operation, and deconstruction of the overbridging, the bridge will be designated as a construction site.
Waterways Ireland apologises for any inconvenience caused and appreciates the cooperation of all users. Further updates will be provided as necessary.
Peter Harty, Inspector of Navigation
Inspectorate.Athlone@waterwaysireland.org
Sperrung von Grand Canal und Greenway an der L’Estrange-Brücke
Waterways Ireland weist Kapitäne von Schiffen und Greenway-Nutzer darauf hin, dass die Schifffahrt auf dem Grand Canal und der Zugang zur L’Estrange-Brücke von Samstag, 22. März, 18:00 Uhr, bis Sonntag, 23. März 2025, 08:00 Uhr, gesperrt werden. Während dieser Zeit dürfen keine Schiffe unter der Brücke durchfahren und die Benutzer des Greenway haben keinen Zugang zur Brücke.
Diese Sperrung ist notwendig, um die Installation einer Überbrückungs-konstruktion für den Transport einer für das Kraftwerk Shannonbridge bestimmten anormalen Ladung zu ermöglichen. Für die Dauer der Installation, des Betriebs und des Rückbaus der Überbrückung wird die Brücke als Baustelle ausgewiesen.
Waterways Ireland entschuldigt sich für die entstandenen Unannehmlichkeiten und dankt allen Nutzern für ihre Mitarbeit. Weitere Aktualisierungen werden bei Bedarf bekannt gegeben.