MARINE NOTICE 136 of 2014

Inland Waterway; © WI
Inland Waterway; © WI

MARINE NOTICE, No 136 of 2014

Shannon & Shannon-Erne Navigations

Winter Mooring Period

Services

Further to  Marine Notice No 118 / 2014  Waterways Ireland wishes to advise masters and owners that where faults occur on the supply of fresh water and /or electricity at our moorings and service blocks during this period repairs will be effected commensurate with general maintenance priorities and owners should take precautionary steps if either of these services are required on an on-going basis.

Waterways Ireland thanks its customers for their co-operation in this matter.

Charles Lawn, Inspector of Navigation, Athlone, 13 Nov 2014

Ice at the Moorings Marine ©Pas Vite click picture to "enlarge"
Ice at the Moorings Marine ©Pas Vite

MARINE NOTICE 135 of 2014

Clonmacnoise;© Google Maps; click to "Clonmacnoise"
Clonmacnoise;© Google Maps

MARINE NOTICE, No 135 of 2014

Shannon Navigation

Clonmacnoise

Access Ramp

Waterways Ireland wishes to advise masters and owners that the access ramp to the Clonmacnoise floating mooring has been removed for the winter period.

C.J.Lawn, Inspector of Navigation, 12 Nov 2014

Clonmacnoise Moorings; © Captain’s Handbook; click picture to "enlarge"
Clonmacnoise Moorings

MARINE NOTICE 134 of 2014

Map Inland Waterways Ireland;© Waterways Ireland
Inland Waterway; © WI

MARINE NOTICE, No 134 of 2014

Shannon Navigation

Harbours and Lock Lead-in Jetties

Rising Water Levels

Waterways Ireland wishes to advise masters and owners to take due care with rising water levels as lead-in jetties to locks become submerged and are untenable as moorings.
Also, the mooring lines of vessels berthed in harbours for the winter period should be tended to frequently in the rising water conditions to avoid damage to the vessel or mooring infrastructure.

C.J.Lawn, Inspector of Navigation, 10 Nov 2014

Shannonbridge; © wasserrausch; click picture to "enlarge"
Shannonbridge; © wasserrausch
Shannoncallows; © wasserrausch; click picture to "Wasserrausch Website"
Shannoncallows; © wasserrausch
Athlone; © wasserrausch; click picture to "Wasserrausch Website"
Athlone; © wasserrausch;

MARINE NOTICE 133 of 2014

Enniskillen-Round "O"; © esri; click to Arcgis Map "Enniskillen-Round "O"
Enniskillen-Round „O“; © esri

MARINE NOTICE, No 133 of 2014

Erne System

Enniskillen

Electric Shore Power at Round O

Waterways Ireland wishes to advise its customers that the metered electric power supply at the Round O moorings in Enniskillen will be turned off over the winter months.
The shore power supply will be discontinued from 14th November 2014 until Easter 2015.

Charles Lawn, Inspector of Navigation, 31 Oct 2014

Enniskillen Round O
Enniskillen Round O

MARINE NOTICE 132 of 2014

Map Inland Waterways Ireland;© Waterways Ireland
Inland Waterway; © WI

MARINE NOTICE, No.132 of 2014

Grand, Royal Canals and Barrow Navigation

Planned Winter Closures 2014- 2015

Waterways Ireland wishes to advise Masters and owners of vessels that the following planned closures will be in place for the winter of 2014-2015.

 Grand Canal – Main Line  
 Sallins, Co. Kildare The canal and the public jetty have opened following recent construction works. The longer-term moorings will remain closed until the services are available at this jetty
Lock 29, Ballycowan to Lock 30, Rahan Closed from 13th October 2014 to late December 2014 for structural repairs to Charleville Aqueduct.
Grand Canal – Barrow Line  
Glenaree Bridge to Rathangan Bridge Closed from 28th October 2014 to early January 2015 for winter dredging.
Spencer Bridge to Wilson Bridge Closed from January 2015 to mid March 2015 for winter dredging.
Vicarstown Closed from 29th October to end of November 2014 for essential repairs to Vicarstown Bridge.
Royal Canal  
Spencer Dock, Newcomen Bridge There will be no further lifts of Newcomen railway bridge until the 2015 boating season.
1st Level, Portland Place Structural repairs to the towpath will be undertaken from the end of October 2014 to late December 2014 – the canal will be closed for the duration of the works.
35th Level, Balroe, Co. Westmeath Closed from 13th October 2014 until further notice for essential construction works.
Barrow Navigation  
Bagenalstown, Co. Carlow Closed at Bagenalstown mid March for essential repairs.

Charles Lawn, Inspector of Navigation, 21 October 2014

Barrowline Basis Vicarstown; © Captain’s Handbook
Barrowline Basis Vicarstown; ©CHB
Barrowline Basis Vicarstown; © Captain’s Handbook
Barrowline Basis Vicarstown; © Captain’s Handbook
Athy am Barrow River; © Captain’s Handbook
Athy am Barrow River; © Captain’s Handbook
Bagenalstown Liftingbridge and Lock on Barrow River; © Captain’s Handbook
Bagenalstown Liftingbridge and Lock on Barrow River; © CHB

Captain's Handbook ©
Datenschutz-Übersicht

Diese Website verwendet Cookies, damit wir dir die bestmögliche Benutzererfahrung bieten können. Cookie-Informationen werden in deinem Browser gespeichert und führen Funktionen aus, wie das Wiedererkennen von dir, wenn du auf unsere Website zurückkehrst, und hilft unserem Team zu verstehen, welche Abschnitte der Website für dich am interessantesten und nützlichsten sind.

Die Datenschutzerklärung finden Sie  hier ====>>

This website uses cookies so that we can provide you with the best possible user experience. Cookie information is stored in your browser and performs functions such as recognizing you when you return to our website, and helps our team understand which sections of the website are most interesting and useful to you.

The privacy policy can be found  here ====>>