MARINE NOTICE, No 09 of 2020

Newcomen Raiway Bridge © esri
Newcomen Raiway Bridge © esri

MARINE NOTICE, No 09 of 2020

ROYAL CANAL

NEWCOMEN BRIDGE LIFT DATES 2020

Waterways Ireland wishes to advise that the provisional schedule of bridge lift dates 2020 for Newcomen Bridge, Royal Canal, Dublin is as follows:

Date Day of Week Time
16th April Thursday  11am – 1pm
3th May Sunday   9am – 1pm
30th May Saturday  9am – 1pm
11th June Thursday  11am – 1pm
26th June Friday 11am – 1pm
28th July Tuesday 11am – 1pm
25th August Tuesday  11am – 1pm
24th September Thursday  11am – 1pm

NOTES:

  1. Arrangements have been made for Iarnród Éireann to open the bridge on the above dates / times, if there is demand.
  2. Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or dublincanals@waterwaysireland.org ) require 2 weeks’ notice from boaters for use of these lifts. Should there not be a demand (min 2 boats) for a particular date, Iarnród Éireann will be notified by WI that the scheduled lift is cancelled.
  3. A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.
  4. On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Patrick Harkin, Inspector of Navigation, 12 Feb 2020

Railway Bridge; © Joe Treacy
Railway Bridge; © Joe Treacy

Railway Bridge; © Joe Treacy
Railway Bridge; © Joe Treacy

ROYAL CANAL
NEWCOMEN BRÜCKENAUFZUG TERMINE 2020

Waterways Ireland möchte darauf hinweisen, dass der vorläufige Zeitplan für die Brückenhebung für die Newcomen-Brücke am Royal Canal in Dublin für das Jahr 2020 siehe oben:

HINWEISE:

  1. Es wurden Vorkehrungen getroffen, dass Iarnród Éireann die Brücke zu den oben genannten Terminen / Zeiten öffnen kann, wenn es eine Nachfrage gibt.
  2. Das Waterways Ireland Eastern Regional Office (Tel.: +353(0)1 868 0148 oder dublincanals@waterwaysireland.org ) verlangt eine Vorankündigung von Bootsfahrern für die Benutzung dieser Aufzüge von 2 Wochen. Sollte für ein bestimmtes Datum keine Nachfrage bestehen (mindestens 2 Boote), wird Iarnród Éireann von WI benachrichtigt, dass der geplante Lift abgesagt wird.
  3. Es wird eine maximale Anzahl von Booten eingesetzt, um die oben genannten Zeiten für die geplanten Aufzüge einzuhalten (16 für die Sat-/Sonnenaufzüge und 8 für die Wochentagsaufzüge). Die Priorität wird nach dem Prinzip „Wer zuerst kommt, mahlt zuerst“ vergeben.
  4. Am Tag des Lifts müssen Bootsfahrer und Passagiere den Anweisungen des Personals von Waterways Ireland über die Reihenfolge der Durchfahrt unter der Brücke und durch Schleuse 1 folgen und sich innerhalb der gekennzeichneten und ausgewiesenen Bereiche aufhalten.

MARINE NOTICE, No. 08 of 2020

Clashganna Lock-River Barrow; © esri; click to Arcgis Map "Clashganna LockRiver Barrow"
Clashganny Lock-River Barrow; © esri

MARINE NOTICE, No. 08 of 2020

BARROW NAVIGATION

Clashganny

Irish Kayaking Intervarsitis

Waterways Ireland wishes to advise that the Irish Kayaking Intervarsities will take place from Friday 14 February to Sunday 16 February 2020 on the Barrow Navigation at Clashganny and the surrounding area.
Masters of power boats are requested to navigate with due caution and give kayaks a wide berth when navigating in this area.

P. Harkin,Inspector of Navigation,10 Feb 2020

Clashganna Lock
Clashganna Lock

CLASHGANNY  IRISH KAYAKING INTERVARSITIES
Waterways Ireland möchte darauf hinweisen, dass die Irish Kayaking Intervarsities von Freitag, dem 14. Februar, bis Sonntag, dem 16. Februar 2020, auf der Barrow Navigation in Clashganny und Umgebung stattfinden werden.
Die Kapitäne von Motorbooten werden gebeten, mit der gebotenen Vorsicht zu fahren und den Kajaks einen weiten Platz einzuräumen, wenn sie in diesem Gebiet fahren

MARINE NOTICE, No 7 of 2020

Map Inland Waterways Ireland;© Waterways Ireland
Inland Waterway; © WI

MARINE NOTICE, No 7 of 2020

SHANNON NAVIGATION

CLOSURE OF LOCKS FOR STAFF TRAINING DAY

Wednesday 5th February 2020

Waterways Ireland wishes to advise masters and owners of vessels that Athlone lock, Pollboy lock, Victoria lock, Sarsfield lock and Portumna Bridge will all be closed on Wednesday 5th February 2020 in order to facilitate Waterways Ireland staff training.

Waterways Ireland regrets any inconvenience this may cause and thanks its customers for their cooperation.

P Harkin, Inspector of Navigation, 29 January 2020

Clarendon Lock © esri
Clarendon Lock © esri
Lough Allen Canal Map © esri; click picture to Lough Allen ArcGis Map
Lough Allen Map © esri
Rooskey Bridge & Lock; © esri; click to Shannon Map Rooskey
Rooskey Bridge & Lock; © esri
Shannon-Tarmonbarry; © esri;
Shannon-Tarmonbarry Lock; © esri

Clondara Lock Camlin; © esri; clicl picture to ArcGismap Shannon Clondara Lock
Clondara Lock Camlin; © esri
Jamestown Canal Shannon; © esri; click picture to Albert-Lock
Albert Lock; © esri

Schließung der Schleusen für den Tag der Personalausbildung
Mittwoch, 5. Februar 2020
Waterways Ireland möchte Kapitäne und Schiffseigner darauf hinweisen, dass die Schleusen Athlone, Pollboy, Victoria, Sarsfield und die Portumna-Brücke am Mittwoch, den 5. Februar 2020 geschlossen werden, um die Ausbildung des Personals von Waterways Ireland zu erleichtern.
Waterways Ireland bedauert jegliche Unannehmlichkeiten, die dies verursachen könnte, und dankt seinen Kunden für ihre Zusammenarbeit.

MARINE NOTICE No. 6 of 2020

Lock 23 and 24 Grand Canal; © esri
Lock 23 and 24 Grand Canal; © esri

MARINE NOTICE No. 6 of 2020

Grand Canal–Cappincur Area – 24th Lock

Closure and Reduced Water Level

24th Lock Deep Gate Replacement

Waterways Ireland wishes to advise users of the Grand Canal in the Cappincur
Area (Tullamore) that water levels will be reduced and the navigation will be closed over the coming weeks, in order to facilitate lock gate replacement works at Lock No 24.
Works will be in progress from 27 January 2020 to 17 March 2020.
Waterways Ireland thanks it customers for their understanding in this matter.

Patrick Harkin, Inspector of Navigation, Tel: 353 90 6494232, 24 Jan 2020

 24th Lock on the Grand Canal, east of Tullamore © Copyright JP and licensed for reuse under this Creative Commons Licence
24th Lock Grand Canal, Tullamore; © JP licensed under this CCLicence

Schließung und reduzierter Wasserstand
24. Austausch des Deep Gates der Schleuse
Waterways Ireland möchte die Nutzer des Grand Canal im Gebiet von Cappincur (Tullamore) darauf hinweisen, dass der Wasserstand reduziert wird und die Schifffahrt
in den kommenden Wochen geschlossen werden, um die Austauscharbeiten an der Schleuse Nr. 24 zu erleichtern.
Die Arbeiten werden vom 27. Januar 2020 bis zum 17. März 2020 durchgeführt.

MARINE NOTICE, No. 5 of 2020

GC Naas Line; © esri; click to Arcgis Map "GC Naas Line-Co. Kildare"
GC Naas Line; © esri; Lock 1
Grand Canal Lock 15
Grand Canal Lock 15; © esri

MARINE NOTICE, No. 5 of 2020

Grand Canal – Naas Branch

Reduced Water Levels

Level 15 – Killeen Golf Club to Digby Bridge

Waterways Ireland wishes to advise users of the Grand Canal that water levels will be reduced in the Sallins area (Level 15) over the coming weeks, in order to facilitate lock gate replacement works at Lock N1 on the Naas Line.

    • Works will be in progress from 21 January 2020 to 1 April 2020.

Waterways Ireland thanks it customers for their understanding in this matter.

Patrick Harkin, Inspector of Navigation

GC Naas-Line Lock 2 Leistner Mills; © Irish waterways history
GC Naas-Line Lock 2 Leistner Mills
GC Naas Lock 3; © Irish waterways history
GC Naas-Line Lock 3

Reduzierte Wasserstände
Ebene 15 – Killeen Golf Club bis Digby Bridge
Waterways Ireland möchte die Nutzer des Canal Grande darauf hinweisen, dass die Wasserstände im Gebiet von Sallins (Ebene 15) in den kommenden Wochen gesenkt werden, um die Austauscharbeiten an der Schleuse N1 der Naas-Linie zu erleichtern.

  • Die Arbeiten werden vom 21. Januar 2020 bis zum 1. April 2020 durchgeführt.