Opening dates during ongoing emergency repair works
Waterways Ireland wishes to notify Master of Vessels on the Royal Canal due to ongoing serious mechanical issues with Begnagh Bridge, the bridge can only be operated manually on scheduled dates as follows;
25th June, 2nd July and 9th July 2021.
Lifts will occur at 11am on each day. Prior notice must be given 2 days in advance to the Waterpatroller in Clondra on 087-9151400.
Waterways Ireland apologies for any inconvenience caused to its users.
Patrick Harkin, Inspector of Navigation, Waterways Ireland, 18 June 2021
Royal Canal, Begnagh Bridge Öffnungstermine während laufender Notreparaturarbeiten Waterways Ireland möchte die Schiffsführer auf dem Royal Canal darauf hinweisen, dass die Begnagh-Brücke aufgrund der laufenden schweren mechanischen Probleme nur an folgenden Tagen manuell bedient werden kann; 25. Juni, 2. Juli und 9. Juli 2021. Die Lifts werden an jedem Tag um 11 Uhr stattfinden. Eine Vorankündigung muss 2 Tage im Voraus beim Wasserpatroller in Clondra unter 087-9151400 erfolgen. Waterways Ireland entschuldigt sich für alle Unannehmlichkeiten, die den Benutzern entstehen.
The Lough Erne (Navigation) Bye-Laws (Northern Ireland) 1978 Section 39
Temporary Prohibition of Motorised Craft at Castle Archdale/Davy’s Island
Notice is hereby given that Waterways Ireland will temporarily prohibit the use of motorised craft on a section of Lough Erne located in the vicinity of Castle Archdale Caravan Park and Davy’s Island. The area will be temporarily closed to motorised craft from June to October 2021. The designated area will be clearly marked by floating buoys. Any individual wishing to make a submission in relation to this notice or view the associated mapping may do so at
Waterways Ireland thanks its customers for their co-operation in relation to this matter.
Patrick Harkin, Inspector of Navigation, 17 June 2021
Erne System, Lower Lough Erne Die Lough Erne (Navigation) Bye-Laws (Nordirland) 1978 Abschnitt 39 Vorübergehendes Verbot für motorisierte Fahrzeuge bei Castle Archdale/ Davy’s Island Hiermit wird bekannt gegeben, dass Waterways Ireland die Benutzung von motorisierten Fahrzeugen auf einem Abschnitt des Lough Erne in der Nähe des Castle Archdale Caravan Park und Davy’s Island vorübergehend verbieten wird. Das Gebiet wird von Juni bis Oktober 2021 vorübergehend für motorisierte Boote gesperrt sein. Das ausgewiesene Gebiet wird durch schwimmende Bojen deutlich gekennzeichnet sein. Alle Personen, die eine Stellungnahme zu dieser Bekanntmachung abgeben oder die zugehörige Karte einsehen möchten, können dies unter tun. Waterways Ireland dankt seinen Kunden für ihre Kooperation in dieser Angelegenheit.
Installation of two temporary green navigation markers Waterways Ireland wishes to notify masters of vessels and waterways users that two temporary green navigation markers have been installed on the upstream approaches to the canal at Meelick.
Masters of vessel are requested to proceed with additional caution on the approaches to Meelick canal.
Waterways Ireland wishes to thank its customers for their cooperation.
Meelick – stromaufwärts gelegene Zugänge zum Kanal Installation von zwei temporären grünen Schifffahrtszeichen Waterways Ireland möchte Schiffskapitäne und Wasserstraßenbenutzer darüber informieren, dass zwei temporäre grüne Schifffahrtszeichen an den stromaufwärts gelegenen Zufahrten zum Kanal bei Meelick installiert wurden. Schiffskapitäne werden gebeten, an den Zufahrten zum Meelick-Kanal mit zusätzlicher Vorsicht vorzugehen. Waterways Ireland bedankt sich bei seinen Kunden für ihre Kooperation.
Waterways Ireland wishes to notify Masters and owners of vessels in Grand Canal Dock Dublin that diving operations will now take place on 15 June 2021 in order to conduct an underwater survey of the anchor systems on the existing moorings in Grand Canal Basin
Waterways Ireland apologise for any inconvenience caused.
Patrick Harkin, Inspector of Navigation, 14 June 2021
Grand Canal Dock, Dublin, Tauchoperationen, 15. Juni 2021 Waterways Ireland möchte die Kapitäne und die Eigentümer von Schiffen im Grand Canal Dock Dublin darüber informieren, dass am 15. Juni 2021 Tauchoperationen stattfinden werden, um eine Unterwasseruntersuchung der Ankersysteme an den bestehenden Liegeplätzen im Grand Canal Basin durchzuführen Waterways Ireland bittet um Entschuldigung für die entstandenen Unannehmlichkeiten.
Waterways Ireland wish to update masters and owners of boat passage arrangements in or out of Dublin on the Grand & Royal Canals in 2021. Movements in or out of the city will continue to be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.
In order to plan the necessary lock assistance for movements east of Lock 12 on either canal, Masters are required to contact the Waterways Ireland Eastern Regional Office by email:
dublincanals@waterwaysireland.org
or tel: ++353-(0)1-868-0148
prior to making passage. At time of making contact please advise the following details:
Length, beam, water & air drafts of your craft (provide approximates if don’t have exact dimensions)
Phone / email contact details
Permit number and expiry date of current canal permit
On the Grand Canal a minimum of two days’ notice prior to planned passage must be given and, with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either East or West. In certain circumstances, e.g. for slower or larger barges, the limit will be 1 boat per day. Due to periodic anti-social activity along some of canal route into Dublin, boat passage will also not be possible in certain weather conditions and at weekends over the late spring & summer period. This can be planned for at time of making contact, and suitable arrangements for passage made.
On the Royal Canal repairs and upgrades are ongoing to Spencer Dock Sea Lock, so boat passage through here remains suspended at this time and no bridge lift dates have been set for Newcomen Lift Bridge. Should there be updates to this position, details of these will be advised by separate Notice.
Masters and owners are also reminded to ensure that they have the following before making the passage through the city locks on either canal. Waterways Ireland reserve the right to postpone passage to another day if all of these are not in place.
adequate fuel on board
competent and adequate crew to operate the boat and locks (minimum crew of 3)
a lock key on board their boat
mooring lines of adequate length to handle vessel through a lock (approx.15m length)
no known mechanical problems with their boat
Passages can be arranged in this boating season from June until the end of October. Also note that aquatic weed is generally more prevalent as the season progresses which can hamper passage. Boaters will be facilitated as far as practicable although Waterways Ireland cannot guarantee that passage will be possible on every planned date. Early contact will greatly assist planning and facilitate the making of the necessary arrangements.
Patrick Harkin, Inspector of Navigation, 12 June 2021
Royal – und Grand Canal Boat Passage in und out of Dublin 2021 Waterways Ireland möchte Kapitäne und Eigner über die Regelungen für Bootsdurchfahrten in oder aus Dublin auf den Grand & Royal Canals im Jahr 2021 informieren. Fahrten in oder aus der Stadt werden weiterhin nach vorheriger Absprache als eine einzige Fahrt an einem Tag organisiert. Bootsfahrern wird die Befahrung des Systems erleichtert, wenn ihre Durchfahrt von Waterways Ireland als sicher eingestuft wird und sie die gültige(n) Genehmigung(en) für das Anlegen und die Durchfahrt besitzen. Um die notwendige Schleusenhilfe für Fahrten östlich von Schleuse 12 auf beiden Kanälen zu planen, müssen Kapitäne das Waterways Ireland Eastern Regional Office per E-Mail: dublincanals@waterwaysireland.org oder Tel.:
++353-(0)1-868-0148
vor der Durchfahrt kontaktieren. Bitte geben Sie bei der Kontaktaufnahme die folgenden Details an:
Länge, Breite, Wasser- und Lufttiefgang Ihres Bootes (geben Sie ungefähre Angaben an, wenn Sie keine genauen Maße haben)
Telefon-/E-Mail-Kontaktdaten
Genehmigungsnummer und Ablaufdatum der aktuellen Kanalerlaubnis
Auf dem Grand Canal muss die geplante Durchfahrt mindestens zwei Tage im Voraus angekündigt werden. Mit Ausnahme von vorher vereinbarten Veranstaltungen werden maximal zwei Boote pro Tag durch die Schleusen gefahren, entweder in Richtung Osten oder Westen. Unter bestimmten Umständen, z.B. bei langsameren oder größeren Kähnen, ist die Grenze bei 1 Boot pro Tag. Aufgrund regelmäßiger antisozialer Aktivitäten entlang eines Teils der Kanalroute nach Dublin ist die Durchfahrt für Boote bei bestimmten Wetterbedingungen und an Wochenenden im späten Frühjahr und Sommer nicht möglich. Dies kann bei der Kontaktaufnahme eingeplant und entsprechende Vorkehrungen für die Durchfahrt getroffen werden. Auf dem Royal Canal laufen Reparaturen und Modernisierungen an der Seeschleuse Spencer Dock, so dass die Schiffspassage hier zur Zeit ausgesetzt bleibt, und für die Newcomen Lift Bridge wurden noch keine Termine für eine Brückenhebung festgelegt. Sollte es hier Änderungen geben, werden diese in einer separaten Mitteilung bekannt gegeben. Kapitäne und Eigner werden außerdem daran erinnert, sich zu vergewissern, dass sie vor der Durchfahrt durch die Stadtschleusen auf beiden Kanälen über Folgendes verfügen. Waterways Ireland behält sich das Recht vor, die Durchfahrt auf einen anderen Tag zu verschieben, wenn nicht alle diese Punkte vorhanden sind.
ausreichend Treibstoff an Bord
eine kompetente und ausreichende Besatzung für die Bedienung des Bootes und der Schleusen (mindestens 3 Personen)
einen Schleusenschlüssel an Bord ihres Bootes
Festmacherleinen von ausreichender Länge, um das Boot durch eine Schleuse zu führen (ca. 15 m Länge)
keine bekannten mechanischen Probleme mit ihrem Boot
Passagen können in dieser Bootssaison von Juni bis Ende Oktober arrangiert werden. Beachten Sie auch, dass mit fortschreitender Saison das Vorkommen von Unkraut zunimmt, was die Durchfahrt erschweren kann. Waterways Ireland kann jedoch nicht garantieren, dass die Durchfahrt zu jedem geplanten Termin möglich ist. Eine frühzeitige Kontaktaufnahme hilft bei der Planung und erleichtert das Treffen der notwendigen Vorkehrungen.