
xxx
MARINE NOTICE, No. 105 of 2015
Grand Canal
Main Line Dublin
Re-opens Mon 10 Aug 2015
Waterways Ireland wishes to advise masters and owners that the Grand Canal Main Line between 3rd Lock (Blackhorse Bridge) and 11th Lock (Clondalkin) will re-open on Mon 10th Aug.
Marine Notice No 91 of 2015 is now withdrawn
C.J.Lawn, Inspector of Navigation, 7 Aug 2015
