MARINE NOTICE, No 03 of 2019

GC Naas Line; © esri; click to Arcgis Map "GC Naas Line-Co. Kildare"
GC Naas Line; © esri

GRAND CANAL – NAAS LINE

Reduction in Water Levels and Restriction to Navigation -Naas Linie

Waterways Ireland wishes to advice all users of the Grand Canal – Naas Line – between Locks No. No. 2 and 3 that water levels will be lowered from 14th January to 17th March 2019 in order to facilitate deep gate replacement at Lock No. 3.

Navigation will not be possible at this time.

Vessels moored on this level (between Locks No. 2 and 3 are advised to re-locate to the 1strd Level (between Locks No. 1 and 2) where soft bank moorings are available.
Waterways Ireland thanks it customers for their cooperation in this matter.

Patrick Harkin, Inspector of Navigation, 07 Jan 2019

GC Naas-Line Lock 2 Leistner Mills; © Irish waterways history
GC Naas-Line Lock 2 Leistner Mills
GC Naas Lock 3; © Irish waterways history
GC Naas-Line Lock 3

Senkung des Wasserspiegels und Einschränkung der Navigation -Naas Linie
Waterways Ireland möchte allen Benutzern des Grand Canal – Naas Line – zwischen den Schleusen Nr. 2 und 3 mitteilen, dass der Wasserstand vom 14. Januar bis 17. März 2019 gesenkt wird, um den Austausch des tiefen Tores am Schleuse Nr. 3 zu erleichtern. Eine Navigation ist zur Zeit nicht möglich.
Schiffen, die auf dieser Ebene (zwischen den Schleusen Nr. 2 und 3) vertäut sind, wird empfohlen, sich in die erste Ebene (zwischen den Schleusen Nr. 1 und 2) zu begeben, wo weiche Uferverankerungen vorhanden sind.
Waterways Ireland dankt seinen Kunden für die Zusammenarbeit in dieser Angelegenheit.