MARINE NOTICE, No. 87 of 2020

Lower Bann; © esri; click to Esri Map lower Bann
Lower Bann Portna and Movanagher; © esri

MARINE NOTICE, No. 87 of 2020

Lower Bann Navigation

Downstream from Cutts Lock

Dredging Operations, From 01 October for 3 weeks

Waterways Ireland wishes to inform boaters that there will be some restriction on movement through the downstream channel of Cutts lock for 3 weeks from Thursday 1st Oct due to essential dredging works.
Boaters should contact the lock keeper at the Cutts lock in advance of travel to ensure passage is viable.

P Harkin, Inspector of Navigation, 01 October 2020, Tel: + 353 87 9852324

Lock at the Cutts, River Bann Colaraine; © Copyright Albert Bridge
Lock at the Cutts Colaraine; © Albert Bridge
Lock at the Cutts, River Bann Colaraine; © Copyright Albert Bridge
Lock at the Cutts, Colaraine; © Albert Bridge

Stromabwärts von Cutts Lock
Baggerarbeiten, ab 01. Oktober für 3 Wochen
Waterways Ireland möchte die Bootsfahrer darüber informieren, dass es ab Donnerstag, dem 1. Oktober, für 3 Wochen aufgrund wesentlicher Baggerarbeiten eine gewisse Einschränkung der Bewegung durch den stromabwärts gelegenen Kanal der Schleuse Cutts geben wird.
Bootsfahrer sollten sich vor der Fahrt mit dem Schleusenwärter an der Schleuse Cutts in Verbindung setzen, um sicherzustellen, dass die Durchfahrt machbar ist.

MARINE NOTICE, No. 86 of 2020

River Barrow  © esri
River Barrow © esri

MARINE NOTICE, No. 86 of 2020

BARROW NAVIGATION

Upper Ballyellen Lock

Gate Replacement

From 14th October 2020 for 8 weeks

Waterways Ireland wishes to advise all users of the Barrow Navigation, that, in order to facilitate the fixing of new deep gates, Upper Ballyellen Lock on the Barrow Navigation will be closed to navigation from Wednesday 14th October for 8 weeks approx.
Waterways Ireland thanks it customers for their cooperation in this matter.

Patrick Harkin, Inspector of Navigation, Tel: 353 90 6494232, 30 Sept 2020

Ersatz des oberen Ballyellen-Schleusentors
Ab 14. Oktober 2020 für 8 Wochen
Waterways Ireland möchte alle Benutzer der Barrow-Schifffahrt darauf hinweisen, dass die Schleuse Upper Ballyellen Lock on the Barrow Navigation ab Mittwoch, dem 14. Oktober, für ca. 8 Wochen für die Schifffahrt gesperrt wird, um die Anbringung neuer tiefer Tore zu erleichtern.
Waterways Ireland dankt seinen Kunden für ihre Mitarbeit in dieser Angelegenheit.