MARINE NOTICE, No. 118 of 2022

Grand Canal–08-09th Lock -Clondalkin Bridge; © esri
Grand Canal–08-09th Lock -Clondalkin Bridge; © esri

MARINE NOTICE, No. 118 of 2022

Grand Canal, Greenway closure

Lock 8 to Lock 9

16 November to 16 December 2022

Waterways Ireland wishes to advise users of the Grand Canal Greenway that the greenway section from the 8th Lock to the 9th Lock will be closed from 16th November 2022 to 16th December 2022 to accommodate services installation works.
No public access is permitted during these works. A temporary Traffic Management Plan with diversions for pedestrians and cyclists will be in place.
Waterways Ireland thanks its customers for their understanding in relation to this matter.
P Harkin, Inspector of Navigation, 11 November 2022

Grand Canal Lock 9; © Marinas.com
Grand Canal Lock 9; © Marinas.com
Grand Canal Lock 8; © Marinas.com
Grand Canal Lock 8; © Marinas.com

Grand Canal, Schließung des Greenway,
Lock 8 bis Lock 9, 16. November bis 16. Dezember 2022

Waterways Ireland möchte die Nutzer des Grand Canal Greenway darauf hinweisen, dass der Abschnitt des Greenway von der 8. Schleuse bis zur 9. Schleuse vom 16. November 2022 bis zum 16. Dezember 2022 gesperrt wird, um Arbeiten zur Installation von Versorgungsleitungen durchzuführen.
Während dieser Arbeiten ist der öffentliche Zugang nicht gestattet. Es wird ein vorläufiger Verkehrsmanagementplan mit Umleitungen für Fußgänger und Radfahrer eingerichtet.
Waterways Ireland dankt seinen Gästen für ihr Verständnis in dieser Angelegenheit.