Bridge Repair Works

Waterways Ireland wishes to advise masters of all craft that bridge repair works will be taking place on the Shannon-Erne Waterway from Wednesday 14th February until mid-March 2024. The bridge repair works will take place at Roscarbon Bridge (Drumcong) Co. Leitrim. During this operation a mechanical platform will be hung from the side of the bridge by mechanical plant. The navigable channel will remain open, however, please comply with safety signage and heed all instructions from safety personnel who will be in the area, the co-operation of Masters is requested at this time.
Waterways Ireland wishes to apologise for any inconvenience that this operation may cause our customers.

Patrick Harkin Inspector of Navigation, 13th February 2024

Roscarbon Bridge Co. Leitrim; © wasserrausch
Roscarbon Bridge Co. Leitrim; © wasserrausch

Shannon-Erne-Wasserstraße, Roscarbon-Brücke (Drumcong), Grafschaft Leitrim
Reparaturarbeiten an der Brücke
Waterways Ireland möchte die Kapitäne aller Wasserfahrzeuge darauf hinweisen, dass ab Mittwoch, den 14. Februar bis Mitte März 2024 auf dem Shannon-Erne-Wasserweg Brückenreparaturarbeiten durchgeführt werden. Die Brückenreparaturen finden an der Roscarbon Bridge (Drumcong) in der Grafschaft Leitrim statt. Während dieser Arbeiten wird eine mechanische Plattform mit Hilfe von Maschinen an der Seite der Brücke aufgehängt. Die Schifffahrtsrinne wird offen bleiben, aber bitte beachten Sie die Sicherheitsbeschilderung und befolgen Sie alle Anweisungen des Sicherheitspersonals, das sich in diesem Bereich aufhalten wird; wir bitten die Schiffsführer um ihre Mithilfe.
Waterways Ireland bittet um Verständnis für die Unannehmlichkeiten, die unseren Gästen durch diese Arbeiten entstehen können.

MARINE NOTICE, No. 11 of 2024

Carrick on Shannon; © esri; click to "ArcgisMap
Carrick on Shannon; © esri

MARINE NOTICE, No. 11 of 2024

Shannon Navigation

Carrick on Shannon

Installation of lighting to underside of bridge arches

Waterways Ireland wishes to notify masters of vessels and users on the Shannon Navigation that the installation of lighting on the underside of Carrick on Shannon bridge arches will take place between 19th Feb – 23rd Feb 2024, works to take place between 10am to 3pm daily.
The contractor will be using a mobile underbridge hoist vehicle, one lane of the bridge will be closed during these hours and a stop / go traffic management plan will be in place for traffic crossing the bridge.
Masters of vessels should proceed with additional caution during these works and comply with the instructions of onsite safety staff.
Waterways Ireland regrets any inconvenience that this may cause and thanks its customers for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation, 12 February 2024

Carrick on Shannon Mooring; © CHB
Carrick on Shannon Mooring; © CHB

Shannon Navigation, Carrick on Shannon
Installation der Beleuchtung an der Unterseite der Brückenbögen
Waterways Ireland möchte die Kapitäne von Schiffen und die Benutzer der Shannon Navigation darüber informieren, dass vom 19. Februar bis zum 23. Februar 2024 täglich zwischen 10 und 15 Uhr eine Beleuchtung an der Unterseite der Brückenbögen von Carrick on Shannon installiert wird.
Das Bauunternehmen wird ein mobiles Hebefahrzeug für die Unterseite der Brücke einsetzen. Während dieser Zeit wird eine Fahrspur der Brücke gesperrt, und für den Verkehr über die Brücke wird ein Stop/Go-Plan eingerichtet.
Die Kapitäne von Schiffen sollten während dieser Arbeiten besonders vorsichtig sein und die Anweisungen des Sicherheitspersonals vor Ort befolgen.
Waterways Ireland bedauert alle Unannehmlichkeiten, die dadurch entstehen können, und dankt seinen Gästen für ihre Kooperation in dieser Angelegenheit.