MARINE NOTICE, No. 89 of 2024
Shannon Navigation
Lough Allen Canal Vegetation Removal
5th September – 23rd December 2024
Waterways Ireland wishes to advise all masters of vessels and users that routine maintenance vegetation removal works will take place along the banks of the Lough Allen Canal between Drumhauver Bridge and Battlebridge, Co. Leitrim.
Works will be ongoing from Thursday 05 September to Monday 23 December 2024, between the hours of 0900 and 1700. Canal and Blueway users are urged to exercise caution in the area; certain Blueway sections may be closed intermittently during this period.
Waterways Ireland regrets any inconvenience that this may cause and thanks its customers for their co-operation in relation to this matter.
P Harkin, Inspector of Navigation, 05 September 2024
|
|
|
|
|
|
Shannon Navigation, Lough Allen Kanal Vegetationsbeseitigung
5. September – 23. Dezember 2024
Waterways Ireland möchte alle Schiffsführer und Nutzer darauf hinweisen, dass entlang der Ufer des Lough Allen Kanals zwischen der Drumhauver Bridge und Battlebridge in der Grafschaft Leitrim routinemäßige Instandhaltungsarbeiten zur Beseitigung der Vegetation durchgeführt werden. Leitrim, stattfinden.
Die Arbeiten werden von Donnerstag, dem 05. September, bis Montag, dem 23. Dezember 2024, zwischen 0900 und 1700 Uhr durchgeführt. Nutzer des Kanals und des Blueways werden gebeten, in diesem Gebiet vorsichtig zu sein; bestimmte Abschnitte des Blueways können während dieser Zeit zeitweise gesperrt sein.
Waterways Ireland bedauert alle Unannehmlichkeiten, die dadurch entstehen können, und dankt seinen Besucher für ihre Kooperation in dieser Angelegenheit.