MARINE NOTICE, No 60 of 2021

Shannon Erne Waterway; © esri
Link to Shannon Erne Waterway; © esri

MARINE NOTICE, No. 60 of 2021

Shannon Erne Waterway (SEW)

Tree Trimming & Hedge Cutting

September 2021 – February 2022

Waterways Ireland wishes to advise all Masters of vessels and users of the waterway that tree trimming and hedge cutting will be carried out at various locations along the Shannon-Erne Waterway during the autumn/winter period.
During this operation floating pontoons will be located on the water with mechanical plant operating. Mechanical plant will also be in operation along the banks of the waterway. Masters of vessels will be advised by Waterways Ireland staff when making a passage, the co-operation of Masters is requested at this time.
Waterways Ireland apologies for any inconvenience caused to our customers.

P Harkin, Inspector of Navigation, 8th September 2021, Tel: 00 353(0)90 6494232

Shannon & SEW Tree Trimming & Hedge Cutting; © Captain’s Handbook
SEW Hedge Trimming/Cutting; © chb
Ballyconnell Lock No 2
Ballyconnell Lock No 2

Shannon Erne Wasserweg (SEW)
Baumbeschneidung und Heckenschnitt, September 2021 – Februar 2022
Waterways Ireland möchte alle Schiffskapitäne und Nutzer der Wasserstraße darauf hinweisen, dass im Herbst/Winter an verschiedenen Stellen des Shannon-Erne Waterway Baum- und Heckenschnittarbeiten durchgeführt werden.
Während dieser Arbeiten werden schwimmende Pontons auf dem Wasser liegen, die mit mechanischen Geräten ausgestattet sind. Auch an den Ufern der Wasserstraße werden maschinelle Anlagen in Betrieb sein. Die Kapitäne der Schiffe werden von den Mitarbeitern von Waterways Ireland über die Durchfahrt informiert; wir bitten die Kapitäne um ihre Mithilfe.
Waterways Ireland entschuldigt sich für alle Unannehmlichkeiten, die unseren Kunden entstehen.

MARINE NOTICE, No 59 of 2021

Lower Lough Erne; © esri; click to ArcGiMap Erne
Lower Lough Erne; © esri;

MARINE NOTICE, No. 59 of 2021

Erne System

Lower Lough Erne

Advance Notice of Reducing Water Levels

Waterways Ireland anticipate that DfI Rivers will be advising that from 1st October 2021, in keeping with water level management protocols, users of the Erne System can expect reducing water levels throughout the navigation as water levels on Lower Lough Erne are drawn down, weather permitting, to a minimum of 149 feet (above Poolbeg Ordnance Datum), in anticipation of increased precipitation during autumn and winter.
If water levels do fall masters should be aware of the following:
Navigation – To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.
Mooring of Vessels – Masters should be aware that water levels may change rapidly and that mooring lines will require adjustment. Therefore mooring lines should be checked regularly.

Patrick Harkin, Inspector of Navigation, Waterways Ireland, Tel: 353 90 6435693, 07 September 2021

Portorra Lock, Lower Lough Erne
Portorra Lock, Lower Lough Erne
Therefore mooring lines should be checked regularly.
Therefore mooring lines should be checked regularly.

Lower Lough Erne- Vorwarnung über sinkende Wasserstände
Waterways Ireland geht davon aus, dass DfI Rivers ab dem 1. Oktober 2021 im Einklang mit den Protokollen zum Wasserstandsmanagement die Nutzer des Erne-Systems auf sinkende Wasserstände in der gesamten Schifffahrt hinweisen wird, da der Wasserstand des Lower Lough Erne in Erwartung verstärkter Niederschläge im Herbst und Winter wetterabhängig auf mindestens 149 Fuß (über Poolbeg Ordnance Datum) gesenkt wird.
Wenn der Wasserstand sinkt, sollten die Schiffsführer Folgendes beachten:
Navigation – Um das Risiko einer Grundberührung zu verringern, sollten Kapitäne auf oder in der Nähe der Mittellinie des Fahrwassers navigieren, Abkürzungen in Fahrwassern mit hundeartigen Beinen und das Navigieren zu nahe an Navigationsmarkierungen vermeiden.
Festmachen von Schiffen – Kapitäne sollten sich darüber im Klaren sein, dass sich der Wasserstand schnell ändern kann und dass die Festmacherleinen angepasst werden müssen. Daher sollten die Vertäuungslinien regelmäßig überprüft werden.