MARINE NOTICE, No 24 of 2021 – Updated

Athy is a town in County Kildare in the Republic of Ireland: © esri
Link to Athy Town in County Kildare: © esri

MARINE NOTICE, No 24 of 2021 – Updated

Grand Canal – Barrow ine

Lock  26 Athy

REPAIRS COMPLETED

Waterways Ireland wishes to notify Masters and owners of vessels that repairs to Lock 26 at Athy on the Barrow Line of the Grand Canal have been completed.
Waterways Ireland thanks its customers for their patience and consideration.
Patrick Harkin, Inspector of Navigation, 21 May 2021

Athy Lock 26
Athy Lock 26
Finnery in Lock 26 Lock gate in back
Finnery in Lock 26 Lock gate in back
Athy Cardington Bridge Lock 26
Athy Cardington Bridge Lock 26
Athy Cardington Bridge Lock 26
Athy Cardington Bridge Lock 26

GRAND CANAL – BARROW LINE, Lock 26 ATHY
Die Reparaturen sind abgeschlossen
Waterways Ireland möchte die Skipper und Schiffseigner darüber informieren, dass die Reparaturen an der Schleuse 26 in Athy auf der Barrow Line des Grand Canal abgeschlossen sind.
Waterways Ireland dankt seinen Kunden für ihre Geduld und Rücksichtnahme.

MARINE NOTICE, No 24 of 2021

Athy is a town in County Kildare in the Republic of Ireland: © esri
Link to Athy Town in County Kildare: © esri

MARINE NOTICE, No 24 of 2021

Grand Canal – Barrow Line

Lock 26 Athy: is closed to navigation

Waterways Ireland wishes to notify Masters and owners of vessels that Lock 26 at Athy on the Barrow Line of the Grand Canal is closed to navigation until further notice for essential maintenance and repairs.
Waterways Ireland apologies for any inconvenience caused to its users.

Patrick Harkin, Inspector of Navigation, 13 May 2021

Athy Lock 26
Athy Lock 26
Finnery in Lock 26 Lock gate in back
Finnery in Lock 26 Lock gate in back
Athy Cardington Bridge Lock 26
Athy Cardington Bridge Lock 26
Athy Cardington Bridge Lock 26
Athy Cardington Bridge Lock 26

Grand Canal – Barrow-Linie  Lock 26 Athy
Waterways Ireland möchte die Kapitäne und Bootseigner darüber informieren, dass die Schleuse 26 in Athy an der Barrow Line des Grand Canal bis auf weiteres wegen notwendiger Wartungs- und Reparaturarbeiten für die Schifffahrt geschlossen ist.
Waterways Ireland entschuldigt sich für alle Unannehmlichkeiten, die den Benutzern entstehen.

MARINE NOTICE, No 23 of 2021

Royal Canal Begnagh Bridge; © esri
Royal Canal Begnagh Bridge; © esri

MARINE NOTICE, No 23 of 2021

Royal Canal, Begnagh Bridge

Closure for emergency repair works

Until Monday 24 May 2021

Waterways Ireland wishes to notify Master of Vessels on the Royal Canal that Begnagh Bridge will be out of operation until Monday 24th May 2021 in order to facilitate emergency repair works.
Waterways Ireland apologies for any inconvenience caused to its users.

Patrick Harkin, Inspector of Navigation, Waterways Ireland, 11 May 2021

Begnagh-Lifting and Old Bridge © Copyright JP and licensed CC Licence.

Royal Canal Begnagh-Brücke
Sperrung für Notreparaturarbeiten Bis Montag, 24. Mai 2021
Waterways Ireland möchte die Schiffsführer auf dem Royal Canal davon in Kenntnis setzen, dass die Begnagh-Brücke bis Montag, den 24. Mai 2021, wegen dringender Reparaturarbeiten außer Betrieb sein wird.
Waterways Ireland entschuldigt sich für alle Unannehmlichkeiten, die den Benutzern des Kanals entstehen.

MARINE NOTICE, No. 22 of 2021

Sarsfield's Lock; © esri; click to" esri-map Limerick-Town and Sarsfield Lock"
Sarsfield’s Lock; © esri; Link to „esri-map“

MARINE NOTICE, No. 22 of 2021

SHANNON NAVIGATION

Opening Times for Sarsfield Lock Limerick

Waterways Ireland wishes to advise masters of all craft of the following schedule for the operation of Sarsfield Lock in Limerick.
The lock keeper can also be contacted during the listed operational hours on the mobile phone number: 087 7972998. Outside of operational hours a message can be left on the mobile. Masters of vessels should provide 24 hours prior notice for lock passage.
Due to resource limitations only in exceptional circumstances will the lock gates be operated outside of the listed hours of operation.

Sarsfield Lock Operating Times MAI 2021
Sarsfield Lock Operating Times MAI 2021
Sarsfield Lock Operating Times JUNE 2021
Sarsfield Lock Operating Times JUNE 2021
Sarsfield Lock Operating Times JULY 2021
Sarsfield Lock Operating Times JULY 2021
Sarsfield Lock Operating Times AUGUST 2021
Sarsfield Lock Operating Times AUGUST 2021
Sarsfield Lock Operating Times SEPTEMBER 2021
Sarsfield Lock Operating Times SEPTEMBER 2021

 
Sarsfield Lock Operating Times OCTOBER 2021
Sarsfield Lock Operating Times OCTOBER 2021

 

Waterways Ireland thanks it customers for their cooperation in this matter.

P Harkin, Inspector of Navigation, 10 May 2021

Sarsfields Lock view downstream; © CHB
Sarsfields Lock view downstream; © CHB
Sarsfields Lock view upstream; © CHB
Sarsfields Lock view upstream; © CHB

Öffnungszeiten für Sarsfield Lock Limerick
Waterways Ireland möchte die Kapitäne aller Wasserfahrzeuge auf den folgenden Zeitplan für den Betrieb der Sarsfield Schleuse in Limerick hinweisen.
Der Schleusenwärter ist während der aufgeführten Betriebszeiten auch unter der Handynummer: 087 7972998 zu erreichen. Außerhalb der Betriebszeiten kann eine Nachricht auf dem Mobiltelefon hinterlassen werden. Die Kapitäne von Schiffen sollten die Schleusenpassage 24 Stunden im Voraus ankündigen.
Aufgrund von Ressourcenbeschränkungen werden die Schleusentore nur in Ausnahmefällen außerhalb der aufgeführten Betriebszeiten bedient.
Waterways Ireland bedankt sich bei seinen Kunden für ihre Kooperation in dieser Angelegenheit.

MARINE NOTICE, No. 21 of 2021

Waterways-Ireland
Waterways-Ireland
Covid-19 Link to RKI Germany
Covid-19 Link to RKI Germany

MARINE NOTICE, No. 21 of 2021

The Erne System, the Lower Bann Navigation and the Shannon Erne Waterway (within Northern Ireland)

COVID-19 Response   Access to navigations and availability of Services

Waterways Ireland wishes to advise all Masters of vessels and water users on The Erne System, the Shannon Erne Waterway (within Northern Ireland) and the Lower Bann Navigation of the following notice in relation to access to the navigations and availability of services. These restrictions are in line with guidance provided by the Northern Ireland Executive.

Shannon Erne Waterway – with effect from Monday 10th May 2021

      • All Waterways Ireland locks and service blocks will be open.
      • Local area access to jetties and moorings in accordance with Northern Ireland Executive guidance.
      • Pump-out facilities are available for use.

Erne System – with effect from Monday 10th May 2021

      • • The facilities on the Erne System will be open.
      • • Local area access to jetties and moorings in accordance with Northern Ireland Executive guidance.
      • • Pump-out facilities are available for use.

Lower Bann navigation – various dates as outlined below

      • All Waterways Ireland service blocks will be open from Wednesday 12th May 2021.
      • Local area access to jetties and moorings in accordance with Northern Ireland Executive guidance.
      • Portna and Movanagher Locks – In operation from Wednesday 12th May 2021.
      • Cutts Lock – Out of Operation until Wednesday 12th May 2021 to enable preparation work on lock gates.
      • Toome Lock – Out of operation until Friday 28th May 2021 to enable work on lock gates and lock.
      • Carnroe Lock – Out of operation until further notice pending ongoing engineering investigations.
      • When on jetties please be aware of other users. Wait or move aside to allow others to pass at a safe distance.

General Guidance
We will continually review such measures in light of direction and advice from Government and health professionals and any decisions on service provision will be communicated via the issuance of Marine Notices. If we all continue to observe government guidance, follow advice to limit use, and strictly observe social distancing, together we can combat this pandemic – and be able to enjoy getting back out on or by our waterways when we’ve beaten it.
While our staff are working from home, they are available by phone during normal working hours. Should you need our assistance please do contact us by email at info@waterwaysireland.org
or by phone https://www.waterwaysireland.org/contact-us
Waterways Ireland thanks all vessel owners and operators for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation, Waterways Ireland, 07 May 2021

COVID-19 Antwort – Zugangsmöglichkeiten zu den Navigationssystemen und Verfügbarkeit von Services
Waterways Ireland möchte alle Kapitäne von Schiffen und Wasserbenutzer auf dem Erne System, dem Shannon Erne Waterway (innerhalb Nordirlands) und der Lower Bann Navigation auf die folgende Mitteilung in Bezug auf den Zugang zu den Navigationen und die Verfügbarkeit von Dienstleistungen hinweisen. Diese Einschränkungen stehen im Einklang mit den Richtlinien der nordirischen Regierung.

Shannon Erne Waterway – mit Wirkung ab Montag, 10. Mai 2021

      • Alle Schleusen und Serviceblöcke von Waterways Ireland werden geöffnet sein.
      • Der Zugang zu den Anlegestellen und Liegeplätzen in der Umgebung entspricht den Richtlinien der Northern Ireland Executive.
      • Pump-Out-Einrichtungen können genutzt werden.

Erne System – mit Wirkung ab Montag, 10. Mai 2021

  • Die Einrichtungen auf dem Erne System werden geöffnet sein.
  • Lokaler Zugang zu Stegen und Liegeplätzen in Übereinstimmung mit den Richtlinien der nordirischen Regierung.
  • Pump-out-Einrichtungen stehen zur Nutzung zur Verfügung.
  • Lower Bann Navigation – verschiedene Termine wie unten angegeben
  • Alle Serviceblöcke von Waterways Ireland sind ab Mittwoch, dem 12. Mai 2021, geöffnet.
  • Lokaler Zugang zu Stegen und Liegeplätzen in Übereinstimmung mit den Richtlinien der nordirischen Regierung.
  • Portna und Movanagher Locks – In Betrieb ab Mittwoch, 12. Mai 2021.
  • Cutts Lock – Außer Betrieb bis Mittwoch, 12. Mai 2021, um Vorbereitungs-arbeiten an den Schleusentoren zu ermöglichen.
  • Toome Lock – Außer Betrieb bis Freitag, 28. Mai 2021, um Arbeiten an Schleusentoren und Schleuse zu ermöglichen.
  • Carnroe Lock – Bis auf Weiteres außer Betrieb, da technische Untersuchungen durchgeführt werden.
  • Wenn Sie sich auf den Stegen aufhalten, nehmen Sie bitte Rücksicht auf andere Benutzer. Warten Sie oder gehen Sie zur Seite, um anderen das Passieren in einem sicheren Abstand zu ermöglichen.

Allgemeine Hinweise
Wir werden diese Maßnahmen unter Berücksichtigung der Richtlinien und Ratschläge der Regierung und der Gesundheitsexperten ständig überprüfen und alle Entscheidungen über die Bereitstellung von Diensten werden durch die Ausgabe von Marine-Mitteilungen bekannt gegeben. Wenn wir uns alle weiterhin an die Richtlinien der Regierung halten, die Ratschläge zur Einschränkung des Konsums befolgen und den sozialen Abstand strikt einhalten, können wir gemeinsam diese Pandemie bekämpfen – und es genießen, wieder auf oder an unseren Wasserstraßen unterwegs zu sein, wenn wir sie besiegt haben.
Während unsere Mitarbeiter von zu Hause aus arbeiten, sind sie während der normalen Arbeitszeiten telefonisch erreichbar. Sollten Sie unsere Hilfe benötigen, kontaktieren Sie uns bitte
per E-Mail an   info@waterwaysireland.org
oder per Telefon   https://www.waterwaysireland.org/contact-us