Marine Notice No. 75 of 2026, Update

Portumna Bridge, downstream side; © esri

Marine Notice No. 75 of 2026, Update

Shannon Navigation

Portumna Swing Bridge

Issued: 14 July 2026

Reduced Bridge Opening Schedule During Period of High Temperatures

Waterways Ireland wishes to advise waterway users that, due to the current period of high temperatures, the operating regime for the Portumna Swing Bridge continues to be operating a reduced schedule.
Expansion of the bridge structure during hot weather, combined with reduced tolerances between the fixed and moving components, has increased the risk of the bridge opening not completing fully, resulting in a partial opening of the structure, and potentially blocking both the road and the navigation channel. Where temperatures exceed 25°C and the temperature is rising, the bridge opening schedule will be reduced to the following opening times:

        • 10:00 hrs
        • 11:00 hrs
        • 12:30 hrs

It is anticipated that these revised operating times will apply from 14 July to 24 July 2026. Following further assessment on 24 July 2026, the revised schedule may be extended if required.
During the working week, Monday-Friday, bridge expansion will be monitored and assessed, and if additional openings are safe, the Engineer will authorise as afternoon bridge openings assessed to be safe and low risk. On Saturday and Sunday if the temperature reaches the level specified, ie., 25°C rising, openings will only take place at 10:00, 11:00 and 12:30.
Interim works to minimise disruption to the navigation are ongoing, and a long-term solution to address the impact of high temperatures on the bridge structure is currently being assessed.
Waterways Ireland apologises for any inconvenience caused and thanks waterway users for their cooperation and understanding.

Peter Harty, Inspector of Navigation
Inspectorate.Athlone@waterwaysireland.org

Portumnaswingbridge;
Lough Derg Portumna Swing Bridge; ©chb

Navigation auf dem Shannon, Portumna Swing Bridge,
Veröffentlicht: 14. Juli 2026
Eingeschränkter Brückenöffnungsplan während der Hitzeperiode
Waterways Ireland weist die Nutzer der Wasserstraßen darauf hin, dass die Portumna Swing Bridge aufgrund der derzeitigen Hitzeperiode weiterhin nach einem eingeschränkten Zeitplan betrieben wird.
Die Ausdehnung der Brückenkonstruktion bei heißem Wetter in Verbindung mit verringerten Toleranzen zwischen den festen und beweglichen Bauteilen hat das Risiko erhöht, dass sich die Brücke nicht vollständig öffnen lässt, was zu einer teilweisen Öffnung der Konstruktion und möglicherweise zur Blockierung sowohl der Straße als auch des Schifffahrtskanals führen kann. Wenn die Temperaturen 25 °C überschreiten und weiter steigen, wird der Brückenöffnungsplan auf die folgenden Öffnungszeiten reduziert:

        • 10:00 Uhr
        • 11:00 Uhr
        • 12:30 Uhr

Diese angepassten Betriebszeiten gelten voraussichtlich vom 14. bis zum 24. Juli 2026. Nach einer weiteren Begutachtung am 24. Juli 2026 kann der angepasste Zeitplan bei Bedarf verlängert werden.
Während der Arbeitswoche (Montag bis Freitag) wird die Ausdehnung der Brücke überwacht und bewertet; sollten zusätzliche Öffnungen als sicher erachtet werden, wird der Ingenieur nachmittägliche Brückenöffnungen genehmigen, die als sicher und risikoarm eingestuft werden. An Samstagen und Sonntagen finden Öffnungen nur um 10:00, 11:00 und 12:30 Uhr statt, sofern die Temperatur den festgelegten Wert – d. h. 25 °C und steigend – erreicht.
Derzeit werden vorübergehende Maßnahmen ergriffen, um Beeinträchtigungen der Schifffahrt so gering wie möglich zu halten, und eine langfristige Lösung zur Bewältigung der Auswirkungen hoher Temperaturen auf die Brückenkonstruktion wird derzeit geprüft.
Waterways Ireland entschuldigt sich für etwaige Unannehmlichkeiten und dankt den Nutzern der Wasserstraßen für ihre Zusammenarbeit und ihr Verständnis.

 

Marine Notice No. 75 of 2026

Portumna Swing Bridge; © esri

Marine Notice No. 75 of 2026

Shannon Navigation

Portumna Swing Bridge

Issued: 10/07/2026

Reduced Bridge Opening Schedule During Period of High Temperatures

Waterways Ireland wishes to advise waterway users that, due to the current period of high temperatures, the operating regime for the Portumna Swing Bridge has been temporarily reduced.
Expansion of the bridge structure during hot weather, combined with reduced tolerances between the fixed and moving components, has increased the risk of the bridge opening not completing fully, resulting in a partial opening of the structure.
Where afternoon temperatures exceed 25°C, the bridge opening schedule will be reduced to the following opening times:

        • 10:00 hrs
        • 11:00 hrs
        • 12:30 hrs

It is anticipated that these revised operating times will apply from 10 July to 13 July 2026. Following further assessment on 12 July 2026, the revised schedule may be extended if required.
Interim works to minimise disruption to navigation are ongoing, and a long-term solution to address the impact of high temperatures on the bridge structure is currently being assessed.
Waterways Ireland apologises for any inconvenience caused and thanks waterway users for their cooperation and understanding.

Peter Harty, Inspector of Navigation
Inspectorate.Athlone@waterwaysireland.org

Portumnaswingbridge;
Lough Derg Portumna Swing Bridge; ©chb

Shannon Navigation, Portumna-Drehbrücke
Eingeschränkter Brückenöffnungsplan während der Hitzeperiode; Veröffentlicht: 10.07.2026
Waterways Ireland weist die Wasserstraßennutzer darauf hin, dass aufgrund der derzeitigen Hitzeperiode der Betriebsplan für die Portumna-Drehbrücke vorübergehend eingeschränkt wurde.

Die Ausdehnung der Brückenkonstruktion bei heißem Wetter in Verbindung mit verringerten Toleranzen zwischen den festen und beweglichen Bauteilen hat das Risiko erhöht, dass die Brückenöffnung nicht vollständig erfolgt, was zu einer teilweisen Öffnung der Konstruktion führt.
Wenn die Nachmittagstemperaturen 25 °C überschreiten, wird der Öffnungsplan der Brücke auf die folgenden Öffnungszeiten reduziert:

      • 10:00 Uhr
      • 11:00 Uhr
      • 12:30 Uhr

Es wird davon ausgegangen, dass diese angepassten Betriebszeiten vom 10. Juli bis zum 13. Juli 2026 gelten. Nach einer weiteren Begutachtung am 12. Juli 2026 kann der angepasste Zeitplan bei Bedarf verlängert werden.
Derzeit werden vorläufige Maßnahmen durchgeführt, um Beeinträchtigungen der Schifffahrt so gering wie möglich zu halten, und eine langfristige Lösung zur Bewältigung der Auswirkungen hoher Temperaturen auf die Brückenkonstruktion wird derzeit geprüft.
Waterways Ireland entschuldigt sich für etwaige Unannehmlichkeiten und dankt den Nutzern der Wasserstraßen für ihre Zusammenarbeit und ihr Verständnis.

MARINE NOTICE, No 089 of 2017

Portumna Bridge © esri
Portumna, Swing Bridge; © esri

MARINE NOTICE, No 89 of 2017

SHANNON NAVIGATION

PORTUMNA SWING BRIDGE

Waterways Ireland wishes to advise Masters and owners of vessels that Portumna Swing Bridge is currently non-operational in the closed position.xxx

Navigation through the bridge is not possible at this time.

Further updates will be issued as soon as possible.

Waterways Ireland apologies to their customers for any inconvenience caused.

Shane Anderson, Lt Cdr(rtd), Assistant Inspector of Navigation, 06 Sept 2017

Portumna Bridge; © Captain’s Handbook
Portumna Bridge; © Captain’s Handbook
Portumna Bridge; © Captain’s Handbook
Portumna Bridge; © Captain’s Handbook
Portumna Bridge; © Captain’s Handbook
Portumna Bridge; © Captain’s Handbook
Portumna Bridge open; © CHB
Portumna Bridge open; © CHB

MARINE NOTICE 019 of 2014

Portumna Bridge; © esri

MARINE NOTICE, No 19 of 2014

Shannon Navigation
Lough Derg

Portumna Swing Bridge

Operational

Marine Notice No 9 of 2014 refers. This notice is now withdrawn as the bridge is operational once again.

Charles Lawn, Inspector of Navigation, Feb 2014

Portumnaswingbridge;
Portumna Swing Bridge

 

MARINE NOTICE 009 of 2014

Portumna, Swing Bridge; © esri

MARINE NOTICE, No 9 of 2014

Shannon Navigation
Lough Derg

Portumna Swing Bridge Closure

Waterways Ireland wishes to advise owners and masters that due to unforeseen circumstances Portumna Swing Bridge will be closed for essential maintenance from next Monday 10th February until Monday 3rd. March 2014.
Waterways Ireland regrets any inconvenience that this may cause its customers.

Charles Lawn, Inspector of Navigation, 6 Feb 2014

Portumna Bridge open
Portumna Bridge open
Captain's Handbook ©
Datenschutz-Übersicht

Diese Website verwendet Cookies, damit wir dir die bestmögliche Benutzererfahrung bieten können. Cookie-Informationen werden in deinem Browser gespeichert und führen Funktionen aus, wie das Wiedererkennen von dir, wenn du auf unsere Website zurückkehrst, und hilft unserem Team zu verstehen, welche Abschnitte der Website für dich am interessantesten und nützlichsten sind.

Die Datenschutzerklärung finden Sie  hier ====>>

This website uses cookies so that we can provide you with the best possible user experience. Cookie information is stored in your browser and performs functions such as recognizing you when you return to our website, and helps our team understand which sections of the website are most interesting and useful to you.

The privacy policy can be found  here ====>>