MARINE NOTICE,No. 68 of 2022

Corraquill Aghalane Bridge SEW; © esri
Corraquill -Aghalane Bridge SEW; © esri

MARINE NOTICE,No 68. of 2022

Shannon-Erne Waterway

Channel maintenance Operation

Between Lock 1 (Corraquill) and Aghalane Bridge

Thursday 7th July 2022 for a duration of 2 weeks

Waterways Ireland wishes to advise masters of all craft that emergency channel maintenance operations will be taking place on the Shannon-Erne Waterway between Lock 1 (Corraquill) and Aghalane Bridge commencing on Thursday 7th July 2022 for a duration of 2 weeks.
During this operation mechanical plant will be working onboard a floating pontoon moored in the channel. The navigable channel will remain open and Masters should proceed past the works with caution.
Please comply with safety signage and heed all instructions from safety personnel who will be in the area. The co-operation of Masters is requested at this time.
Waterways Ireland wishes to apologise for any inconvenience that this interference may cause our customers.
Patrick Harkin, Inspector of Navigation, 06 July 2022

Aghalane Bridge (demolished) No 31
Aghalane Bridge (demolished) No 31
 Corraquill Lock 1 an SEW; click picture toWebsite Wasserrausch
Corraquill Lock 1 an SEW;
Shannon-Erne-Waterway, Kanalinstandhaltung Operation
Zwischen Lock 1 (Corraquill) und Aghalane-Brücke
Donnerstag, 7. Juli 2022 für eine Dauer von 2 Wochen
Waterways Ireland möchte die Kapitäne aller Wasserfahrzeuge darauf hinweisen, dass am Donnerstag, den 7. Juli 2022, für die Dauer von zwei Wochen Wartungsarbeiten an der Fahrrinne der Shannon-Erne-Wasserstraße zwischen Lock 1 (Corraquill) und der Aghalane-Brücke durchgeführt werden.
Während dieser Arbeiten werden die mechanischen Anlagen an Bord eines schwimmenden Pontons arbeiten, der in der Fahrrinne verankert ist. Die Fahrrinne bleibt offen und die Schiffsführer sollten die Arbeiten mit Vorsicht passieren.
Bitte beachten Sie die Sicherheitsbeschilderung und befolgen Sie alle Anweisungen des Sicherheitspersonals, das sich in diesem Bereich aufhalten wird. Wir bitten die Kapitäne um ihre Mithilfe in dieser Zeit.
Waterways Ireland möchte sich für alle Unannehmlichkeiten entschuldigen, die unseren Kunden durch diese Beeinträchtigung entstehen können.

MARINE NOTICE, No. 67 of 2022

Castle Island Enniskillen;  © esri; click to Arcgis Map "Castle Island Enniskillen"
Castle Island Enniskillen © esri;

MARINE NOTICE, No. 67 of 2022

Erne Navigation Enniskillen

Castle Island- East Channel Temporary Closure,
Water Activity Area

Waterways Ireland wishes to advise all masters and users of the Erne System that the channel east of Castle Island.
Enniskillen will be closed from 4th July 2022 to 30th September 2022.
This is to create a water activity area. The designated area will be clearly marked by floating buoys. See below layout.
Access to Castle Museum Jetty will be maintained when approaching from the north of Castle Island.
Mariners should use the navigation channel to the west of Castle Island and proceed at slow speed and with minimum wash adhering to any instructions or displayed signage. Mariners should be aware of small non-motorised craft also operating in the navigation.
Waterways Ireland wishes to thank its customers for their co-operation in this matter

P Harkin, Inspector of Navigation, 01 July 2022, Tel: 00 353 (0)90 6494232

Erne Navigation Enniskillen, Castle Island. Ostkanal.
Vorübergehende Schließung. Wasseraktivitätsgebiet

Waterways Ireland möchte alle Kapitäne und alle Benutzer des Erne-Systems darüber informieren, dass der Kanal östlich von Castle Island, Enniskillen, vom 4. Juli 2022 bis zum 30. September 2022 geschlossen wird.
Damit soll ein Wasseraktivitätsgebiet geschaffen werden. Das ausgewiesene Gebiet wird durch schwimmende Bojen deutlich gekennzeichnet. Siehe Grundriss oben oder in der ArcGisMap.
Der Zugang zum Castle Museum Jetty bleibt erhalten, wenn man sich von Norden der Castle Island nähert.
Seeleute sollten die Fahrrinne westlich von Castle Island benutzen und mit langsamer Geschwindigkeit und mit minimaler Aufspülung vorgehen, wobei sie sich an alle Anweisungen und angezeigten Schilder halten sollten. Die Schifffahrtsteilnehmer sollten sich der kleinen nicht motorisierten Fahrzeuge bewusst sein, die ebenfalls in der Fahrrinne verkehren.
Waterways Ireland bedankt sich bei seinen Kunden für ihre Kooperation in dieser Angelegenheit.

MARINE NOTICE, No. 66 of 2022

Lower Bann; © esri; click to Esri Map lower Bann
Lower Bann Navigation © esri

MARINE NOTICE, No. 66 of 2022

Lower Bann Navigation

Carnroe Lock

Closure for ongoing Repaire Works

Waterways Ireland wishes to advise masters and users of the Lower Bann Navigation that Carnroe Lock remains closed due to ongoing essential repair works. As we move towards completion of the remedial works, Waterways Ireland will further advise by means of a Marine Notice on a re-opening date.
Waterways Ireland apologises to its customers for any inconvenience caused.

P Harkin, Inspector of Navigation, 30 June 2022

Carnroe Lock;  © Copyright Albert Bridge CCL
Carnroe Lock; © Copyright Albert Bridge CCL
Carnroe Lock;  © Copyright Albert Bridge CCL
Carnroe Lock; © Copyright Albert Bridge CCL
Carnroe Lock;  © Copyright Albert Bridge CCL
Carnroe Lock; © Copyright Albert Bridge CCL
Carnroe Lock;  © salomonireland
Carnroe Lock; © salomonireland

Lower Bann Navigation,
Carnroe Lock, Schließung wegen laufender Reparaturarbeiten

Waterways Ireland möchte die Kapitäne und die Benutzer der Lower Bann Navigation darauf hinweisen, dass die Carnroe-Lock wegen laufender notwendiger Reparaturarbeiten geschlossen bleibt. Sobald wir uns dem Abschluss der Reparaturarbeiten nähern, wird Waterways Ireland mittels einer Marine Notice ein Datum für die Wiedereröffnung bekannt geben.
Waterways Ireland entschuldigt sich bei seinen Kunden für die entstandenen Unannehmlichkeiten.

MARINE NOTICE, No. 65 of 2022

 Athlone Lock © esri; click picture to esri maps " Athlone Lock © esri"
Link to Athlone Lock © esri

MARINE NOTICE, No. 65 of 2022

Shannon Navigation

Athlone

Construction of pedestrian and cycleway bridge

Update on works

Waterways Ireland wishes to advise all masters of vessels and waterways users that the construction of the Athlone pedestrian and cycleway bridge commenced on 03 May 2022. The pedestrian and cycleway bridge will be built approx. 50 metres upstream of Athlone town bridge.
The navigation channel in the vicinity of the in-water works will continue to be restricted during the works. Large barges, workboats and other equipment will be operating in the navigation from Wansboro’s field (upstream of the Railway Bridge) to Athlone town bridge. Update on each Phase of the project is provided below.
Masters of vessels are advised to proceed with additional caution in the vicinity of the works and to follow the instructions of safety craft and personnel in the area.
Waterways Ireland thanks its customers for their cooperation.
Text Description automatically generated

P Harkin, Inspector of Navigation, 28 June 2022

Phase 1
Phase 1Installation of centre pier cofferdam. 15-18m Navigation Channel along West Bank

Phase2  Phase 2Temporary supports and centre pier in position from Mid-July. Navigation Channel reduced to approx. 15m

Phase 3
Phase 3Temporary supports and centre pier in position from Mid-July. Navigation Channel reduced to approx. 15m

Phase 4
Phase 4Installation of centre bridge section Late-August. Approx. duration of 3-4 days. Maintain 12-15m Navigation Channel along West Bank

Phase 5
Phase 5
Installation of Eastern bridge section approx. Early September. Approx. duration of 3-4 days. Maintain 12-15m Navigation Channel along West Bank

Phase 6
Phase 6Installation of Western bridge section approx. Mid-September. Approx. duration of 3-4 days. Navigation Channel reduced to 10 – 12 metres adjacent to Centre Pier. One way system in operation for vessels.

Phase 7
Phase 7
Removal of temporary works from instream. Approx 1 week duration at end of September / early October. Open permanent 40 metre Navigation Channel along West Bank.

Athlone, Bau einer Fußgänger- und Radwegbrücke, Aktueller Stand der Arbeiten
Waterways Ireland möchte alle Schiffskapitäne und Wasserstraßennutzer darüber informieren, dass die Bauarbeiten für die Fußgänger- und Radwegbrücke in Athlone am 03. Mai 2022 begonnen haben. Die Fußgänger- und Radwegbrücke wird ca. 50 Meter stromaufwärts der Athlone Stadtbrücke gebaut.
Die Schifffahrtsrinne in der Nähe der Unterwasserarbeiten wird während der Arbeiten weiterhin eingeschränkt sein. Große Lastkähne, Arbeitsboote und andere Geräte werden in der Fahrrinne von Wansboro’s Field (flussaufwärts der Eisenbahnbrücke) bis zur Athlone Town Bridge verkehren. Im Folgenden finden Sie aktuelle Informationen zu den einzelnen Phasen des Projekts.
Die Kapitäne der Schiffe werden gebeten, in der Nähe der Arbeiten besonders vorsichtig zu fahren und den Anweisungen der Sicherheitsfahrzeuge und des Personals in diesem Gebiet Folge zu leisten.
Waterways Ireland dankt seinen Kunden für ihre Mitarbeit.
Text Beschreibung automatisch generiert

    • Phase 1
      Einbau eines Kofferdamms für die Mittelmole. 15-18m Schifffahrtskanal entlang des Westufers
    • Phase 2
      Provisorische Stützen und Mittelmole in Position ab Mitte Juli. Reduzierung der Fahrrinne auf ca. 15 m
    • Phase 3
      Temporäre Stützen und Mittelpfeiler ab Mitte Juli in Position. Verringerung der Fahrrinne auf ca. 15 m
    • Phase 4
      Einbau des mittleren Brückenteils Ende August. Dauer: ca. 3-4 Tage. Beibehaltung der 12-15 m breiten Fahrrinne am Westufer
    • Phase 5
      Einbau des östlichen Brückenteils ca. Anfang September. Dauer: ca. 3-4 Tage. Aufrechterhaltung der 12-15 m langen Fahrrinne entlang des Westufers
    • Phase 6
      Einbau des westlichen Brückenteils ca. Mitte September. Dauer: ca. 3-4 Tage. Verkleinerung der Fahrrinne auf 10 – 12 Meter neben der Mittelmole. Einbahnregelung für Schiffe in Betrieb.
    • Phase 7
      Beseitigung der provisorischen Arbeiten im Fluss. Ca. 1 Woche Dauer Ende September/Anfang Oktober. Eröffnung der permanenten 40 Meter langen Fahrrinne entlang des Westufers.

MARINE NOTICE, No. 64 of 2022

Lough Derg IWAI Rally 2022; © esri
Lough Derg IWAI Rally 2022; © esri

MARINE NOTICE, No. 64 of 2022

Shannon Navigation

Lough Derg,

IWAI Rally,

9th to 16th July 2022

Waterways Ireland wishes to advise masters and owners of vessels that the IWAI Lough Derg Rally will take place from Sat 9th to Sun 16th Jul 2022 and will visit the following locations:

      • Saturday, July 9th, Dromann
      • Sunday, July 10th, Dromann
Dromaan-Harbour; click to map; © esri
Dromaan-Harbour; click to map; © esri
Lough Derg Dromaan neuer Service Block;  © Driftwood.TV; click picture to Driftwood.TV
Dromaan neuer Service Block; © Driftwood.TV
Hafeneinfahrt Dromaan
Hafeneinfahrt (Harbour entrance)
Hafeneinfahrt Dromaan
Hafeneinfahrt Dromaan
Picknick Platz (Picnic place)
Picknick Platz (Picnic place)
Anleger Harbour Dromaan
Anleger Harbour Dromaan

      • Monday, July 11th, Mountshannon
      • Tuesday, July 12th, Mountshannon
Mountshannon, Harbour Mooring
Mountshannon, Harbour Mooring
Mountshannon, Harbour Mooring
Mountshannon, Harbour Mooring
Mountshannon Sailing Regatta
Mountshannon Sailing Regatta
Mountshannon, Harbour Mooring
Mountshannon, Harbour Mooring
      • Wednesday, July 13th, Anchor Out
Drop anchor in the Fleet
Drop anchor in the Fleet
All boats are at anchor
All boats are at anchor
View of the stern of the boats
View of the stern of the boats
View of the bow of the boats
View of the bow of the boats
      • Thursday, July 14th, Terryglass
      • Friday, July 15th, Terryglass
      • Saturday, July 16th, Terryglass
Terryglass Harbour Floating Jetty
Terryglass Harbour Floating Jetty
Terryglass Harbour Floating Jetty
Terryglass Harbour Floating Jetty
CIC in Terryglass Harbour
CIC in Terryglass Harbour
Terryglass Harbour on the quay wall
Terryglass Harbour on the quay wall

Masters of vessels should be aware that a significant number of vessels will be participating in the rally.
Waterways Ireland thanks its customers for their cooperation in this matter.

P Harkin, Inspector of Navigation, 28 June 2022

Shannon Navigation, Lough Derg,  IWAI Rallye, 9. bis 16. Juli 2022
Waterways Ireland möchte Kapitäne und Bootsbesitzer darauf hinweisen, dass die IWAI Lough Derg Rallye vom 9. bis 16. Juli 2022 an folgenden Orten stattfinden wird:

      • Samstag, 9. Juli, Dromann
      • Sonntag, 10. Juli, Dromann
      • Montag, 11. Juli, Mountshannon
      • Dienstag, 12. Juli, Mountshannon
      • Mittwoch, 13. Juli, Ankern aussen
      • Donnerstag, 14. Juli, Terryglass
      • Freitag, 15. Juli, Terryglass
      • Samstag, 16. Juli, Terryglass

Die Kapitäne der Schiffe sollten sich bewusst sein, dass eine beträchtliche Anzahl von Schiffen an der Rallye teilnehmen wird.
Waterways Ireland dankt seinen Kunden für ihre Kooperation in dieser Angelegenheit.

Captain's Handbook ©
Datenschutz-Übersicht

Diese Website verwendet Cookies, damit wir dir die bestmögliche Benutzererfahrung bieten können. Cookie-Informationen werden in deinem Browser gespeichert und führen Funktionen aus, wie das Wiedererkennen von dir, wenn du auf unsere Website zurückkehrst, und hilft unserem Team zu verstehen, welche Abschnitte der Website für dich am interessantesten und nützlichsten sind.

Die Datenschutzerklärung finden Sie  hier ====>>

This website uses cookies so that we can provide you with the best possible user experience. Cookie information is stored in your browser and performs functions such as recognizing you when you return to our website, and helps our team understand which sections of the website are most interesting and useful to you.

The privacy policy can be found  here ====>>