MARINE NOTICE, No. 51 of 2020

Map Inland Waterways Ireland;© Waterways Ireland
Inland Waterway; © WI

MARINE NOTICE, No. 51 of 2020

Royal Canal, Grand Canal, Barrow Line & Navigation

Reopening of navigations from 8th June 2020

Waterways Ireland wishes to advise masters and users of the Royal Canal, Grand Canal, Barrow Line & Navigation of the following additional details & clarifications in relation to these navigations, further to the recent MN44/2020 & re-opening roadmap.

    •  Lock operating Hours – 08th to 29th June – 09:30hrs to 17:00hrs daily.
    •  Navigation remains open within 5km of your home; from 8th June this is expected to increase to within 20km from your home
    •  As a cautionary note, water levels are generally low due to the recent time of low rainfall. Also normal maintenance weed-cutting of navigation channels has been late in starting due to the ongoing restrictions, so additional weed growth can be expected in the navigation channels. Masters are asked to contact the local waterway patroller for updated information if wishing to navigate a particular area
    •  Due to the above points, arrangements for boat passage in / out from Dublin are not expected to resume until Phase 3 of the roadmap, at which point they will revert to those set out in MN10/2020. Masters are also advised as an advance notice that works are planned to be undertaken at Lock C4 Mespil Road from end August, which subject to confirmation would necessitate further closure again at this point.
    • The Barrow navigation is closed at Athy and Carlow due to the weir breaches as previously advised by Marine Notices. The Barrow line section is open to navigation.

Waterways Ireland thanks its customers for their ongoing understanding during the navigation re-opening process.
For further information on the reopening of the navigation please visit www.waterwaysireland.org

P. Harkin, Inspector of Navigation, Waterways Ireland, 05 June 2020

Royal Canal, Grand Canal, Barrow Line & Navigation
Wiedereröffnung der Schifffahrt ab 8. Juni 2020
Waterways Ireland möchte die Kapitäne und Benutzer des Royal Canal, des Grand Canal, der Barrow Line und der Navigation auf die folgenden zusätzlichen Details und Klarstellungen in Bezug auf diese Schifffahrtswege hinweisen, im Anschluss an die jüngste MN44/2020 und die Roadmap zur Wiedereröffnung.

    • Schleusenöffnungszeiten – 08. bis 29. Juni – täglich von 09:30 Uhr bis 17:00 Uhr.
    • Die Schifffahrt bleibt in einem Umkreis von 5 km von Ihrem Wohnort geöffnet; ab dem 8. Juni wird dies voraussichtlich auf einen Umkreis von 20 km von Ihrem Wohnort ausgedehnt.
    • Vorsichtshalber sei darauf hingewiesen, dass die Wasserstände aufgrund der jüngsten Zeit mit geringen Niederschlägen im Allgemeinen niedrig sind. Auch der normale Unterhaltungs-Unkrautbeschnitt der Schifffahrtskanäle hat aufgrund der anhaltenden Beschränkungen erst spät begonnen, so dass mit zusätzlichem Unkrautwachstum in den Schifffahrtskanälen gerechnet werden kann. Die Kapitäne werden gebeten, sich für aktuelle Informationen mit dem örtlichen Wasserstraßen-Patrouille in Verbindung zu setzen, wenn sie ein bestimmtes Gebiet befahren möchten.
    • Aufgrund der oben genannten Punkte ist nicht zu erwarten, dass die Vorkehrungen für die Schiffspassage von und nach Dublin vor Phase 3 des Fahrplans wieder aufgenommen werden und dann wieder zu den in MN10/2020 festgelegten Regelungen zurückkehren. Die Kapitäne werden außerdem als Vorankündigung darauf hingewiesen, dass ab Ende August Arbeiten an der Schleuse C4 Mespil Road geplant sind, die vorbehaltlich einer Bestätigung eine weitere Schließung zu diesem Zeitpunkt erfordern würden.
    • Die Barrow-Schifffahrt ist in Athy und Carlow aufgrund der Wehrbrüche geschlossen, wie zuvor in den Mitteilungen der Marine angekündigt. Der Abschnitt Barrow Line ist für die Schifffahrt geöffnet.

Waterways Ireland dankt seinen Kunden für ihr anhaltendes Verständnis während des Wiedereröffnungsprozesses der Schifffahrt.
Für weitere Informationen über die Wiedereröffnung der Schifffahrt besuchen Sie bitte www.waterwaysireland.org

MARINE NOTICE, No. 50 of 2020

Lock 23 and 24 Grand Canal; © esri
Lock 36 – 19 Grand Canal; © esri

MARINE NOTICE, No. 50 of 2020

Grand Canal Rural

Lowtown to Shannon Harbour

Re-Opening of the Locks as of 8 June 2020

Waterways Ireland wishes to advise masters and users of the Grand Canal Rural – Lowtown to Shannon Harbour of the following information regarding the re-opening of the Locks from 8th June 2020:

Lock operating Hours – 08th to 29th June – 09:30hrs to 17:00hrs daily.

Water patrollers

If you need assistance during opening hours please contact the water patrollers on the Grand Canal at the following numbers:-

    • 19th -20th Lock – 087 245 65 31
    • 25th -19th Lock – 087 245 65 25
    • 26th-28th Lock – 087 245 65 41
    • 29th- 31st Lock – 087 245 64 82
    • 32nd-34th Lock – 087 245 66 09
    • 35th-36th Lock – 087 245 65 87

For further information on the reopening of the navigation please visit www.waterwaysireland.org

P. Harkin, Inspector of Navigation, 04 June 2020

Grand Canal Rural   Lowtown bis Shannon Harbour
Wiedereröffnung der Schleusen ab dem 8. Juni 2020
Waterways Ireland möchte die Kapitäne und Benutzer des Grand Canal von Rural – Lowtown to Shannon Harbour über die folgenden Informationen bezüglich der Wiedereröffnung der Schleusen ab dem 8. Juni 2020 informieren:

Schleusenöffnungszeiten – 08. bis 29. Juni – täglich von 09:30 Uhr bis 17:00 Uhr.

Wasser- Patrouille

Wenn Sie während der Öffnungszeiten Hilfe benötigen, wenden Sie sich bitte an die Wasserpatrouillen auf dem Canal Grande unter den folgenden Nummern:-

    • 19th -20th Lock – 087 245 65 31
    • 25th -19th Lock – 087 245 65 25
    • 26th-28th Lock – 087 245 65 41
    • 29th- 31st Lock – 087 245 64 82
    • 32nd-34th Lock – 087 245 66 09
    • 35th-36th Lock – 087 245 65 87

Für weitere Informationen über die Wiedereröffnung der Navigation besuchen Sie bitte www.waterwaysireland.org

Marine Notice, No.49 of 2020

Carrick on Shannon; Midshannon © esri click picture to "esri Midshannon
Carrick on Shannon; Midshannon © esri
Shannon-Hartley Bridge ©CHB

Marine Notice, No.49 of 2020

Shannon Navigation

Carrick on Shannon and Hartley Bridges

Low hanging wires

Waterways Ireland wishes to advise masters and users of the Shannon Navigation that there are low hanging wires on Carrick on Shannon and Hartley bridges.
Waterways Ireland is in communication with the relevant agencies to arrange removal of the navigation hazards.
Vessels with a large air draft are advised to proceed with additional caution when passing under Carrick on Shannon and Hartley bridges until the wires are removed.
Waterways Ireland thanks its customers for their co-operation in relation to this matter.

P Harkin, Inspector of Navigation, 03 June 2020, Tel: + 353 87 9852324

Carrick on Shannon Overhead-Powerline; click picture to "enlarge"
Carrick on Shannon Overhead-Powerline

Carrick on Shannon- und Hartley-Brücke
Niedrig hängende Drähte
Waterways Ireland möchte die Kapitäne und Nutzer der Shannon Navigation darauf hinweisen, dass es auf den Shannon- und Hartley-Brücken niedrig hängende Drähte an Carrick gibt.
Waterways Ireland steht in Kontakt mit den zuständigen Behörden, um die Beseitigung der Gefahren für die Schifffahrt zu veranlassen.
Schiffen mit großer air draft wird empfohlen, bei der Unterquerung der Carrick on Shannon- und Hartley-Brücken mit zusätzlicher Vorsicht vorzugehen, bis die Drähte entfernt sind.
Waterways Ireland dankt seinen Kunden für ihre Zusammenarbeit in dieser Angelegenheit.

Marine Notice, No.48 of 2020

Gesamt Shannon-Map; © esri
Shannon-Navigations-Map; © esri

Marine Notice, No.48 of 2020

Shannon Navigation

Re-opening of the Locks

Operating times from 8th June 2020

Waterways Ireland wishes to advise masters and users of the Shannon Navigation of the following information regarding the reopening of the Locks from 8th June 2020:

Lock Operating Hours (Phase 2)

8th to 29th June  9am – 5pm daily

Lock Passage fee

Lock passage will be free from 8th June until further notice.

Low Water Levels

Master of vessels are reminded that all sections of the Shannon Navigation are near or below Ordinary Summer Levels. Deep draft vessels should stay in the navigation at all times and proceed with additional caution.

Lock-Keepers

Shannon Navigation lock-keepers are available at the following numbers:-

Lough Allen Canal 071 964 1552
Clarendon Lock 071 966 7011
Albert Lock 071 963 7715
Rooskey Lock 071 963 8018
Tarmonbarry Lock 043 332 6117
Athlone Lock 090 649 2026
Poolboy Lock 090 964 4938
Victoria lock 057 915 1359
Portumna Bridge 090 974 1011
Ardnacrusha 061 344 515
Sarsfield Lock 087 797 2998

For further information on the reopening of the navigation please visit www.waterwaysireland.org

P Harkin, Inspector of Navigation, 03 June 2020, Tel: + 353 87 9852324

Ireland Reopening Roadmap © WI
Northern Ireland Reopening Roadmap © WI

Wiedereröffnung der Schleusen – Betriebszeiten ab 8. Juni 2020

Waterways Ireland möchte die Kapitäne und Nutzer der Shannon-Schifffahrt auf die folgenden Informationen bezüglich der Wiedereröffnung der Schleusen ab dem 8. Juni 2020 hinweisen:

Betriebszeiten der Schleusen (Phase 2)

8. bis 29. Juni täglich von 9 bis 17 Uhr

Schleusen Durchgangsgebühr

Die Schleusendurchfahrt wird ab dem 8. Juni bis auf weiteres frei sein.

Niedrige Wasserstände

Die Schiffskapitäne werden daran erinnert, dass alle Abschnitte der Shannon-Navigation in der Nähe oder unterhalb der gewöhnlichen Sommer-Niveaus liegen. Schiffe mit tiefem Tiefgang sollten zu jeder Zeit in der Navigation bleiben und mit zusätzlicher Vorsicht vorgehen.

Schleusenwärter

Die Schleusenwärter von Shannon Navigation sind unter den folgenden Nummern erreichbar:

Lough Allen Canal 071 964 1552
Clarendon Lock 071 966 7011
Albert Lock 071 963 7715
Rooskey Lock 071 963 8018
Tarmonbarry Lock 043 332 6117
Athlone Lock 090 649 2026
Poolboy Lock 090 964 4938
Victoria lock 057 915 1359
Portumna Bridge 090 974 1011
Ardnacrusha 061 344 515
Sarsfield Lock

087 797 2998

Für weitere Informationen über die Wiedereröffnung der Navigation besuchen Sie bitte:

MARINE NOTICE, No. 47 of 2020

Lock 23 and 24 Grand Canal; © esri
Lock 23 and 24 Grand Canal; © esri

MARINE NOTICE, No. 47 of 2020

Grand Canal – Cappincur Area

Closure of Southern Towpath between Digby Bridge at Cappincur and Ballycommon Bridge

Waterways Ireland wishes to advise their customers that the towpath on south side of the Grand Canal between Digby Bridge at Cappincur and Ballycommon Bridge will be closed to users from the 8th June 2020 to the 7th September 2020 to facilitate the construction of the Grand Canal greenway.
Waterways Ireland thanks its customers for their co-operation in this matter.

P. Harkins, Inspector of Navigation, 03 June 2020

Grand Canal – Cappincur-Gebiet
Schließung des südlichen Towpath zwischen der Digby-Brücke bei Cappincur und der Ballycommon-Brücke
Waterways Ireland möchte seine Kunden darauf hinweisen, dass der Treidelpfad auf der Südseite des Grand Canal zwischen der Digby-Brücke bei Cappincur und der Ballycommon-Brücke vom 8. Juni 2020 bis zum 7. September 2020 für Benutzer gesperrt wird, um den Bau der Grünfläche des Grand Canal zu erleichtern.